RERA ID: P51700050650
Project Name: VAVIYA ARIES
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-09-30
Proposed Date of Completion
While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address: Nerul, Plot 86, Sector 21, Navi Mumbai (M Corp.), Thane-400706
Plot Bearing No / CTS no / Survey Number/Final Plot no.:
PLOT NO 86, SECTOR 21
Boundaries:
15 METER WIDE ROAD |
PLOT NO 87 | N | PLOT NO 85 |
W | | E |
S |
11 METER WIDE ROAD |
The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.
Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and
may contain error.
Key Details
Total Project Area: 349 sq.mt.
Sanctioned Built-up Area: 1138 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 7
No. of Plinths: 1
No. of Closed Parking: 24
Units on Offer and Availability
Category |
Carpet Area |
No of Units |
Units already Booked / Sold |
2BHK |
472 to 494 sq ft |
6 |
3 |
3BHK |
784 to 835 sq ft |
7 |
4 |
Litigations
Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!
Introducing Vaviya Aries: A New Residential Project in Nerul, Navi Mumbai
Nestled in the vibrant locality of Nerul, Navi Mumbai, Vaviya Aries is a brand new residential project poised to offer comfortable and contemporary living. Developed by Neelkanth Infra, a reputable partnership firm, this project promises a serene and convenient lifestyle.
Project Highlights:
- RERA Registered: Vaviya Aries is registered with MahaRERA under the ID P51700050650, ensuring transparency and consumer protection.
- Prime Location: Situated in Sector 21, Nerul, the project boasts a strategic location with excellent connectivity to various parts of Navi Mumbai. The 15-meter wide road to the north and the 11-meter wide road to the south provide convenient access.
- Spacious and Modern Units: The project offers a range of meticulously designed 2BHK and 3BHK apartments, ranging from 472 sq ft to 835 sq ft. Each unit is crafted to maximize space utilization and provide a comfortable living experience.
- Well-Planned Amenities: Vaviya Aries offers a carefully curated set of amenities to enhance the quality of life for its residents. This includes a dedicated parking space for 24 vehicles, ensuring convenience for residents and their guests.
- Commitment to Quality: The project is being developed by Neelkanth Infra, a trusted name in the real estate industry, ensuring adherence to high standards of construction and quality.
- Completion Timeline: Vaviya Aries is expected to be completed by September 30th, 2025.
Project Details:
- Project Type: Residential
- Total Plot Area: 349 sqmts
- Number of Buildings: 1
- Sanctioned FSI: 1138
- Permissible FSI: 1238
- Number of Floors: 7
Investor Information:
- Promoter/Land Owner: The project does not have any promoters or land owners as defined by the MahaRERA order.
- Bank Details: Karnataka Bank (IFSC Code: KARB0000637)
Vaviya Aries presents an attractive investment opportunity for those seeking a comfortable and modern lifestyle in the thriving city of Navi Mumbai. With its strategic location, well-designed apartments, and commitment to quality, this project promises to deliver an enriching living experience.
New documents listed below were uploaded to the Documents section:
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
- 7 Disclosure of sold/ booked inventory
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
Progress updated under Buildings section
Bldg No. |
Tasks / Activity |
Percentage of Work |
1 |
Stilt Floor |
50 |
1 |
X number of Slabs of Super Structure |
50 |
1 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
33 |
1 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
8 |
1 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
4 |
1 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
34.5 |
Progress updated under Ameneties section
Common areas And Facilities, Amenities |
Percent |
Details |
Sewerage (Chamber, Lines, Septic Tank , STP) : |
20 |
Chambers Lines Septic Tank to be provided |
Progress updated under Buildings section
Bldg No. |
Tasks / Activity |
Percentage of Work |
1 |
X number of Basement(s) and Plinth |
100 |
1 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
20 |
New documents listed below were uploaded to the Documents section:
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
- 5 Disclosure of sold/ booked inventory
- 6 Disclosure of sold/ booked inventory
New documents listed below were uploaded to the Documents section:
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
- 4 Disclosure of sold/ booked inventory
- 3 Disclosure of sold/ booked inventory
- 2 Disclosure of sold/ booked inventory
- 1 Disclosure of sold/ booked inventory
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
Progress updated under Buildings section
Bldg No. |
Tasks / Activity |
Percentage of Work |
1 |
Excavation |
100 |
1 |
X number of Basement(s) and Plinth |
50 |
1 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
15 |
Progress updated under Ameneties section
Common areas And Facilities, Amenities |
Percent |
Details |
Water Supply : |
0 |
Provided up to site by CIDCO |
Sewerage (Chamber, Lines, Septic Tank , STP) : |
0 |
Chambers Lines Septic Tank to be provided |
Units booking and availability updated under Buildings section
Apartment Type |
Carpet Area (in Sqmts) |
Number of Apartment |
Number of Booked Apartment |
2BHK |
43.89 |
2 |
2 |
2BHK |
45.93 |
4 |
1 |
3BHK |
72.86 |
1 |
1 |
3BHK |
75.03 |
1 |
1 |
3BHK |
77.58 |
5 |
2 |
Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.
- Architect’s Certificate of Percentage of Completion of Work (Form 1)
- Building Plan Approval / NA Order for plotted development
- CERSAI details [2]
- Commencement Certificates / NA Order for plotted development
- Copy of Layout Approval (in case of layout)
- Copy of the legal title report
- Declaration about Commencement Certificate
- Declaration in FORM B
- Deviation Report with respect to Allotment letter
- Deviation Report with respect to model copy of Agreement
- Disclosure of Interest in Other Real Estate Organizations [2]
- Proforma of Agreement for sale
- Proforma of Allotment letter
- a Details of encumbrances concerned to Finance
- b Details of encumbrances concerned to Legal