RERA ID: P51700048570
Project Name: Shree Siddhivinayak
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-06-30
Proposed Date of Completion
While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address: Near Ashok Talkies, Dutt Mandir Road, , Thane-400601
Plot Bearing No / CTS no / Survey Number/Final Plot no.:
269
Boundaries:
cts no 267 A |
cts no 270 | N | Cts No 268 |
W | | E |
S |
9 mtr DP road |
The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.
Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.
Key Details
Total Project Area: 148 sq.mt.
Sanctioned Built-up Area: 648 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 7
No. of Plinths: 1
No. of Stilts: 1
No. of Closed Parking: 1
Units on Offer and Availability
Category |
Carpet Area |
No of Units |
Units already Booked / Sold |
1BHK |
309 to 372 sq ft |
14 |
9 |
Office |
83 sq ft |
1 |
0 |
Shop |
126 sq ft |
2 |
1 |
Litigations
Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!
Introducing Shree Siddhivinayak: A New Residential Development in Thane
Shree Siddhivinayak Developers is proud to present its latest project, Shree Siddhivinayak, a new residential development in the bustling city of Thane. Located in the prime locality of Near Ashok Talkies, this project offers a unique blend of modern living and convenient access to all essential amenities.
Project Highlights:
- Prime Location: Situated on a 148 sq. meter plot near Ashok Talkies in Thane, Shree Siddhivinayak enjoys a strategic location with close proximity to essential amenities like schools, hospitals, markets, and entertainment hubs.
- Modern Design: The project features a single building with a total of 7 sanctioned floors and a stilt floor, offering a contemporary design and well-planned living spaces.
- Varied Units: Shree Siddhivinayak offers a range of unit options to suit diverse needs, including 14 spacious 1BHK apartments (ranging from 309 to 372 sq ft), 1 office space (83 sq ft), and 2 shops (126 sq ft).
- Limited Units: With a limited number of units, Shree Siddhivinayak offers a unique opportunity to invest in a well-planned and exclusive development.
- Convenience: The project features a single closed parking space for added convenience, while the proximity to a 9-meter DP road ensures smooth connectivity to the rest of Thane city.
Project Details:
- RERA ID: P51700048570
- Proposed Date of Completion: June 30, 2025
- Project Type: Residential
- Permissible Total FSI: 648
- Total Sanctioned Built-up Area: 648 sq. meters
Developer Information:
- Developer Name: Shree Siddhivinayak Developers
- Organization Type: Partnership
- Office Address: 203 Bldg no 2, Vaastu Anand, Old Mumbai Pune Road, Parsik Nagar, Kalwa, Thane (M Corp.), Thane, Maharashtra 400605
- Office Number: 9820264679
Investment Opportunity:
Shree Siddhivinayak presents a promising investment opportunity in the heart of Thane. With its strategic location, modern design, and limited units, this project is sure to appeal to both home buyers and investors looking for a lucrative investment in a prime location.
Disclaimer: This introduction is based on the provided information and does not constitute investment advice. Prospective investors are encouraged to conduct their own due diligence before making any investment decisions.
New documents listed below were uploaded to the Documents section:
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)
Progress updated under Buildings section
Bldg No. |
Tasks / Activity |
Percentage of Work |
1 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
70 |
1 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
60 |
1 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
40 |
1 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
80 |
Progress updated under Buildings section
Bldg No. |
Tasks / Activity |
Percentage of Work |
1 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
100 |
1 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
50 |
1 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
50 |
1 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
10 |
1 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
76 |
Units booking and availability updated under Buildings section
Apartment Type |
Carpet Area (in Sqmts) |
Number of Apartment |
Number of Booked Apartment |
1BHK |
28.71 |
7 |
4 |
1BHK |
34.56 |
7 |
5 |
New documents listed below were uploaded to the Documents section:
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
New documents listed below were uploaded to the Documents section:
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
Progress updated under Ameneties section
Common areas And Facilities, Amenities |
Percent |
Details |
Sewerage (Chamber, Lines, Septic Tank , STP) : |
0 |
Work not yet started |
Water Supply : |
0 |
Work not yet started |
Electrical Meter Room, Sub-Station, Receiving Station : |
0 |
Work not yet started |
Fire Protection And Fire Safety Requirements : |
0 |
Work not yet started |
Energy management : |
0 |
Work not yet started |
Water Conservation, Rain water Harvesting : |
0 |
Work not yet started |
Treatment And Disposal Of Sewage And Sullage Water : |
0 |
Work not yet started |
Solid Waste Management And Disposal : |
0 |
Work not yet started |
Landscaping & Tree Planting : |
0 |
Work not yet started |
Storm Water Drains : |
0 |
Work not yet started |
Progress updated under Buildings section
Bldg No. |
Tasks / Activity |
Percentage of Work |
1 |
X number of Podiums |
100 |
1 |
X number of Slabs of Super Structure |
100 |
1 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
80 |
1 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
50 |
1 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
63 |
Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.
- Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) [2]
- Architect’s Certificate of Percentage of Completion of Work (Form 1) [7]
- Building Plan Approval / NA Order for plotted development
- CERSAI details [2]
- Commencement Certificates / NA Order for plotted development
- Copy of Layout Approval (in case of layout)
- Copy of the legal title report
- Declaration about Commencement Certificate
- Declaration in FORM B
- Deviation Report with respect to Allotment letter
- Deviation Report with respect to model copy of Agreement [2]
- Engineer’s Certificate on Cost Incurred on Project (Form 2) [7]
- Other – Finance
- Other – Legal [2]
- Proforma of Agreement for sale
- Proforma of Allotment letter
- a Details of encumbrances concerned to Finance
- b Details of encumbrances concerned to Legal