MH
Thane
P51700034887
RERA ID: P51700034887
Project Name: Vardhaman Tower Building Nos. 6 & 7
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2024-12-30
Extended Date of Completion
The project missed completion date 1 time(s) earlier (2023-12-31).


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Sagarli Village,Dombivali East, Kalyan-Shil Road, Thane (M Corp.), Thane-421204

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
Plot bearing SurveyNo.26Hissa No1(part),survey no 26 hissa no4(PART),survey no26 hissa no5(part),survey no26 hissa no 6(part) and survey no 53 hissa no 1(part)

Boundaries:
alyan shil road
urvey no 25N Building No 5 of Riverwood Park
WE
S
electrical substation bldg no 1 of riverwood park

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 3891 sq.mt.
Sanctioned Built-up Area: 19764 sq.mt.
Recreational Open Space: 3891 sq.mt.
No. of Buildings sanctioned: 2
No. of Floors sanctioned: 48
No. of Plinths: 2
No. of Podiums: 6
No. of Stilts: 2
No. of Open Parking: 39
No. of Closed Parking: 248

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 433 to 441 sq ft 174 28
2BHK 633 to 649 sq ft 192 37
Project Developer:
Vardhaman Property Developers
Organization Type: Partnership

Address: 40-41, Vishal Shopping Centre, Sir M.V .Road, Andheri East, Vishal Hall, Andheri, Mumbai Suburban-400069

Office Phone: +91 22268 39917


Member details:
Member Name Designation
Sandesh Laxmichandra Vardhan Partner
Motichandra Sanwalchand Vardhan Partner
Heerachand Sanwalchand Vardhan Partner
Vijay Heerachand Vardhan Partner
Amit Heerachand Vardhan Partner
Urmila Sandesh Vardhan Partner


Co-Promotors:
Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement
Shree Khidkaleshwar Property Developers Private Li Company Revenue Share


Other Professionals involved:
Professional Name Professional Type
MULTISTOREYS PROJECTS PVT. LTD. Contractor
VASTURACHNA Architect
EPICONS CONSULTANTS PVT.LTD. Engineer
MSMD & CO Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Unveiling Vardhaman Tower: An Exceptional Residential Oasis in the Heart of Thane

Nestled amidst the vibrant landscape of Thane, Maharashtra, Vardhaman Tower emerges as a beacon of modern living. With its RERA ID P51700034887, this mesmerizing residential project promises a haven of tranquility and urban convenience.

As you enter Vardhaman Tower’s sprawling 3891 square meters of land, you will be greeted by two architecturally stunning buildings, gracefully designed with 48 meticulously planned floors. The project’s spacious recreational open space, extending over the entire plot area, invites residents to connect with nature and enjoy moments of leisure amidst verdant surroundings.

This landmark development boasts an impressive portfolio of amenities to cater to every aspect of modern living. Residents can relax and unwind in the project’s fully equipped gymnasium, indulge in rejuvenating swims in the sparkling swimming pool, or simply socialize in the tastefully landscaped garden. For the discerning few, a luxurious terrace deck provides panoramic city views, creating a perfect setting for intimate gatherings or special celebrations.

Vardhaman Tower is meticulously planned to ensure the utmost comfort and safety of its residents. With its two stilts and six podiums, the project offers ample parking spaces, both open and closed, accommodating a total of 287 vehicles. The project’s robust security measures, including CCTV surveillance and intercom facilities, provide peace of mind to residents, ensuring their well-being day and night.

The project’s strategic location in the heart of Thane offers unparalleled convenience. The Kalyan-Shil Road provides seamless connectivity to major business hubs, educational institutions, and healthcare facilities. The project’s proximity to the upcoming Dombivali Metro Station further enhances its accessibility, making it an ideal choice for discerning homebuyers.

Vardhaman Tower’s developer, Vardhaman Property Developers, brings a wealth of experience and expertise to the forefront. As the project nears its completion date of December 31, 2023, potential buyers can rest assured of the highest quality construction and finishes.

With its exceptional amenities, prime location, and unwavering commitment to excellence, Vardhaman Tower stands as a beacon of modern living in Thane. It is an invitation to experience the epitome of comfort, convenience, and urban sophistication. Whether you seek a cozy 1BHK or a spacious 2BHK, Vardhaman Tower is the perfect abode to fulfill your residential aspirations.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 40.28 88 14
1BHK 41.03 86 14
2BHK 58.89 48 12
2BHK 59.01 48 6
2BHK 60.33 96 19

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Solid Waste Management And Disposal : 100 Part of layout
Storm Water Drains : 100 Part of layout
Fire Protection And Fire Safety Requirements : 90 Part of layout
Electrical Meter Room, Sub-Station, Receiving Station : 80 Part of layout
Sewerage (Chamber, Lines, Septic Tank , STP) : 96 Part of layout
Water Conservation, Rain water Harvesting : 100 TO BE PROVIDED BY TMC

 

New documents listed below were uploaded to the Documents section:

  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Excavation 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
1 Overall Percentage of Completion of the work done For the entire Building /Wing 89
2 Excavation 100
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
2 Overall Percentage of Completion of the work done For the entire Building /Wing 94

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Storm Water Drains : 70 Part of layout
Sewerage (Chamber, Lines, Septic Tank , STP) : 80 Part of layout
Electrical Meter Room, Sub-Station, Receiving Station : 60 Part of layout
Fire Protection And Fire Safety Requirements : 65 Part of layout
Water Conservation, Rain water Harvesting : 90 TO BE PROVIDED BY TMC
Solid Waste Management And Disposal : 80 Part of layout

 

There is a change in Project timelines and the completion date is moved ahead. The project is now scheduled to complete by 2024-12-30

 

New documents listed below were uploaded to the Documents section:

  • 1 b Details of encumbrances concerned to Legal
  • 2 a Details of encumbrances concerned to Finance
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 1 Disclosure of sold/ booked inventory

 

New documents listed below were uploaded to the Documents section:

  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Excavation 98
1 X number of Podiums 100
1 Stilt Floor 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
1 Overall Percentage of Completion of the work done For the entire Building /Wing 87.8
2 Excavation 97
2 X number of Podiums 100
2 Stilt Floor 100
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
2 Overall Percentage of Completion of the work done For the entire Building /Wing 88.1

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Building Plan Approval / NA Order for plotted development
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report [2]
  • Declaration about Commencement Certificate
  • Declaration in FORM B [2]
  • Details of encumbrances
  • Other [7]
  • Proforma of Allotment letter [2]