MH
Thane
P51700032684
RERA ID: P51700032684
Project Name: Fiora A, B and C
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-11-30
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Dombivali, Hedutane, Kalyan, Thane-421203

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
260/1A, 260/1B, 260/2, 260/3

Boundaries:
24 by 1B and 260 by 1
260 by 2N 212 by 2 and 3 and 260 by 4
WE
S
260 by 3

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 3394 sq.mt.
Sanctioned Built-up Area: 31800 sq.mt.
Recreational Open Space: 1673 sq.mt.
No. of Buildings sanctioned: 3
No. of Floors sanctioned: 72
No. of Plinths: 3
No. of Stilts: 3
No. of Closed Parking: 3

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 337 to 427 sq ft 472 451
3BHK 795 sq ft 9 9
Project Developer:
MACROTECH DEVELOPERS LIMITED
Organization Type: Company

Address: 412 Floor- 4, 17G Vardhaman Chamber, Cawasji Patel Road, Horniman Circle, Fort, Mumbai City-400001

Office Phone: +91 22613 34761


Member details:
Member Name Designation
RAJENDRA LODHA Chairperson
Bankim Doshi Authorized Signatory


Other Professionals involved:
Professional Name Professional Type
Vilas Desai & Associate Architect
K C Shah Consultants Engineer
Chirag Sarvaiya & Co Chartered Accountant


Projects in the state by this developer:
P51700054370 - Lodha Villa Royale TDLR 2 - Thane
P51700053191 - Crown Dombivli 3 - Thane
P51700053124 - Upper Thane - Eden D - Thane
P51700053017 - Thane Project - Thane
P51700052950 - Belvedere-B and C - Thane
P51700052578 - Upper Thane - Tiara G - Thane
P51700052470 - Olivia Tower - A - Thane
P51700052421 - Fiora J - Thane
P51700052406 - Fiora K - Thane
P51700052389 - Upper Thane-Tiara H - Thane
…and 152 more
Litigations

Litigations related to the project ? No
Complaints

Complaint No Complainant Name
CC006000000479929 Kiran Murlidhar Jakkulwar
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Fiora A, B, and C: A New Residential Development in Dombivali

MACROTECH DEVELOPERS LIMITED is pleased to announce the launch of Fiora A, B, and C, a new residential project situated in the heart of Dombivali, Thane. This project, registered under RERA ID: P51700032684, promises to offer a luxurious and comfortable living experience to its residents.

Fiora A, B, and C is a meticulously planned project spanning a total plot area of 3394 sq. meters. The project comprises three distinct buildings, all of which have been sanctioned and are currently under construction. The project is expected to be completed by November 30, 2025.

Location and Connectivity:

Strategically located in Hedutane, Dombivali, Fiora A, B, and C offers easy access to major arterial roads and public transportation, ensuring seamless connectivity to various parts of the city. The project’s proximity to essential amenities like schools, hospitals, and shopping malls further enhances its appeal.

Architectural Design and Amenities:

Fiora A, B, and C boasts a modern and aesthetically pleasing design with a focus on maximizing space utilization and natural light. The project offers a range of amenities to enhance the residents’ lifestyle. These include:

  • Spacious Apartments: Designed to cater to diverse needs, the apartments offer comfortable living spaces with well-planned layouts.
  • Landscaped Gardens and Recreational Areas: The project dedicates a substantial portion of the land to landscaped gardens and recreational areas, providing residents with a tranquil and refreshing environment.
  • Security and Surveillance: The project prioritizes the safety and security of its residents with advanced surveillance systems and round-the-clock security personnel.

Investment Opportunity:

Fiora A, B, and C presents an excellent opportunity for discerning homebuyers seeking a comfortable and modern living experience in a prime location. With its strategic location, thoughtfully designed spaces, and comprehensive amenities, this project promises a rewarding investment for the future.

About MACROTECH DEVELOPERS LIMITED:

MACROTECH DEVELOPERS LIMITED, a well-established and reputable real estate developer, is committed to delivering high-quality residential projects that meet the evolving needs of its customers. With a proven track record of successful projects, MACROTECH is known for its commitment to quality, innovation, and customer satisfaction.

For more information on Fiora A, B, and C, please contact MACROTECH DEVELOPERS LIMITED at 2261334761 or visit their office at 17G Vardhaman Chamber, Cawasji Patel Road, Horniman Circle, Mumbai, 400001.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 39.11 180 175
1BHK 39.39 270 266

 

New documents listed below were uploaded to the Documents section:

  • 6 Disclosure of sold/ booked inventory

 

New documents listed below were uploaded to the Documents section:

  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • 1 Architect’s Certificate on Completion of Project (Form 4)
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 80
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
2 Overall Percentage of Completion of the work done For the entire Building /Wing 80
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
3 Overall Percentage of Completion of the work done For the entire Building /Wing 80

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Internal Roads & Footpaths : 100
Electrical Meter Room, Sub-Station, Receiving Station : 100
Fire Protection And Fire Safety Requirements : 100
Water Conservation, Rain water Harvesting : 100
Water Supply : 100
Sewerage (Chamber, Lines, Septic Tank , STP) : 100
Storm Water Drains : 100
Landscaping & Tree Planting : 100
Street Lighting : 100
Community Buildings : 100 shared across the phases of real estate project
Treatment And Disposal Of Sewage And Sullage Water : 100
Solid Waste Management And Disposal : 100

 

The RERA designated separate bank account details have been modified. The new details are: Bank Name: Yes Bank Ltd IFSC Code: YESB0000001

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Fire Protection And Fire Safety Requirements : 70
Internal Roads & Footpaths : 30
Storm Water Drains : 70
Electrical Meter Room, Sub-Station, Receiving Station : 80
Water Supply : 70
Sewerage (Chamber, Lines, Septic Tank , STP) : 70

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 83
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 85
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 92
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 60
1 Overall Percentage of Completion of the work done For the entire Building /Wing 67
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 83
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 85
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 92
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 60
2 Overall Percentage of Completion of the work done For the entire Building /Wing 67
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 83
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 85
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 92
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 60
3 Overall Percentage of Completion of the work done For the entire Building /Wing 67

 

New documents listed below were uploaded to the Documents section:

  • 5 Disclosure of sold/ booked inventory
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 31.4 3 2
1BHK 39.11 180 176
1BHK 39.39 270 268

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [3]
  • Building Plan Approval / NA Order for plotted development [4]
  • CERSAI details [5]
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout) [2]
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances [2]
  • Disclosure of sold/ booked inventory [4]
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [2]
  • Proforma of Allotment letter