RERA ID: P51700019830
Project Name: INDRADHANUSH
Project Type: Others
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2027-03-30
Extended Date of Completion
The project missed completion date 1 time(s) earlier (2024-10-30).


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Kashigaon, Mira Bhayander, Kashigaon Road, Mira-Bhayandar (M Corp.), Thane-401107

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
20/2

Boundaries:
SANKALP APARTMENT
NILKAMAL APARTMENTSN GREEN WOOD COMPLEX
WE
S
AMISHA GARDEN

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 8790 sq.mt.
Sanctioned Built-up Area: 14640 sq.mt.
Recreational Open Space: 1276 sq.mt.
No. of Buildings sanctioned: 3
No. of Floors sanctioned: 61
No. of Plinths: 3
No. of Podiums: 4
No. of Stilts: 2
No. of Open Parking: 34
No. of Closed Parking: 395

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 759 to 764 sq ft 350 137
Shop 331 to 421 sq ft 14 0
Project Developer:
SONAM HOMES PRIVATE LIMITED
Organization Type: Company

Address: 1St Floor, Shanti Niwas, 100 Feet Road, Bhayander East, Opp. Jain Mandir, Mira-Bhayandar (M Corp.), Thane-401105

Office Phone: +91 22281 47484


Member details:
Member Name Designation
BHARAT MITHALAL JAIN Authorized Signatory
SNEHA NAMAN SAKLECHA Director


Other Professionals involved:
Professional Name Professional Type
DINESH N PATEL Architect
DINESH N PATEL Engineer
DIMPLE N PUNMIYA Chartered Accountant
MUSTAK HAMID Contractor
MOHD ALIM KHAN Contractor
AMARENDRA KAR Contractor
KHIMRAJ MISTRY Contractor
BALU DHIWARE Contractor


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing INDRADHANUSH: A New Residential Development in Mira Bhayandar

SONAM HOMES PRIVATE LIMITED, a reputable developer in the Thane district, is proud to present INDRADHANUSH, a new residential project in the sought-after locality of Kashigaon, Mira Bhayandar. This project, with RERA ID P51700019830, is set to redefine urban living with its thoughtfully designed apartments and comprehensive amenities.

INDRADHANUSH is strategically located on a spacious 8790 sq.m. plot (Plot Bearing No. 20/2), offering residents the convenience of being close to essential amenities while enjoying the tranquility of a well-planned community. The project enjoys a prime location, nestled amidst established residential developments like GREEN WOOD COMPLEX, NILKAMAL APARTMENTS, SANKALP APARTMENT, and AMISHA GARDEN, ensuring a vibrant and comfortable living environment.

The project comprises three buildings, each rising to a height of 61 floors, including two stilts and a podium. With a total sanctioned built-up area of 14640 sq.m., INDRADHANUSH offers a wide range of apartments, catering to diverse family needs. The project boasts a generous 1276 sq.m. of open recreational space, designed to provide residents with ample opportunities for relaxation and leisure.

In addition to its prime location and spacious apartments, INDRADHANUSH also offers a comprehensive range of amenities, including:

  • Open Parking: 34 parking spaces for 4-wheelers and 2-wheelers
  • Closed Parking: 395 secure parking spaces
  • Plinth and Podium: Three plinths and four podiums provide ample open space within the project.

The project is currently under construction and is expected to be completed by March 30th, 2027. This gives potential buyers ample time to secure their dream home in this promising development.

INDRADHANUSH offers an exceptional opportunity to invest in a well-planned and future-proof residential project in a rapidly growing location. With its focus on quality construction, thoughtful design, and extensive amenities, INDRADHANUSH promises a comfortable and enriching lifestyle for its residents.

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 85
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
1 Overall Percentage of Completion of the work done For the entire Building /Wing 57.1
2 Stilt Floor 85
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 75
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 75
2 Overall Percentage of Completion of the work done For the entire Building /Wing 47.6

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 70.54 210 93
2BHK 70.88 110 26
2BHK 70.98 30 18

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Sewerage (Chamber, Lines, Septic Tank , STP) : 90 WORK ON PROGRESS
Electrical Meter Room, Sub-Station, Receiving Station : 30 WORK ON PROGRESS
Fire Protection And Fire Safety Requirements : 80 WORK ON PROGRESS
Storm Water Drains : 90 WORK ON PROGRESS

 

New documents listed below were uploaded to the Documents section:

  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)

 

New documents listed below were uploaded to the Documents section:

  • 17 Other
  • 18 Other
  • 19 Other
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 14 Disclosure of sold/ booked inventory

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Storm Water Drains : 50 WORK ON PROGRESS
Electrical Meter Room, Sub-Station, Receiving Station : 20 NEW PROJECT WORK YET TO START
Fire Protection And Fire Safety Requirements : 70 WORK ON PROGRESS

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Stilt Floor 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 85
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 70
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 95
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
1 Overall Percentage of Completion of the work done For the entire Building /Wing 53.6
2 Excavation 100
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 70
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 45
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 70
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 25
2 Overall Percentage of Completion of the work done For the entire Building /Wing 45.1

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 70.54 210 84
2BHK 70.88 110 22
2BHK 70.98 30 15

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 395 132 80

 

New documents listed below were uploaded to the Documents section:

  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)

 

Members added or updated under Firm details section

Member Name Designation
SNEHA NAMAN SAKLECHA Director

 

New documents listed below were uploaded to the Documents section:

  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
  • 13 Disclosure of sold/ booked inventory

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Open Parking : 60 WORK ON PROGRESS
Fire Protection And Fire Safety Requirements : 50 WORK ON PROGRESS

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 70
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 60
1 Overall Percentage of Completion of the work done For the entire Building /Wing 46.6
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
2 Overall Percentage of Completion of the work done For the entire Building /Wing 39.2

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 395 100 60

 

Building/Plot Details section updated for field(s) as below:

Field updated New value
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) 34
Number of Closed Parking 395

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Building Plan Approval (IOD) [17]
  • CERSAI details [4]
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project) [5]
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project) [7]
  • Commencement Certificates / NA Order for plotted development [3]
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B [4]
  • Details of encumbrances
  • Disclosure of Interest in Other Real Estate Organizations [2]
  • Disclosure of sold/ booked inventory [12]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • Form 2A [10]
  • Other [16]
  • Proforma of Allotment letter [9]