RERA ID: P51700015939
Project Name: CONTINENTAL FUTURA
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-03-30
Extended Date of Completion
The project missed completion date 1 time(s) earlier (2024-03-30).


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Kon Gaon, Kalyan Bhiwandi Road, Kon (Ct), Bhiwandi, Thane-421302

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
238-1,2,239-1A,1A2,1A3,258-3

Boundaries:
SURVE NO-260
SURVE NO-260N SURVE NO-239
WE
S
SURVE NO-258

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 13250 sq.mt.
Sanctioned Built-up Area: 9637 sq.mt.
Recreational Open Space: 2392 sq.mt.
No. of Buildings sanctioned: 3
No. of Floors sanctioned: 37
No. of Plinths: 3
No. of Podiums: 2
No. of Stilts: 2
No. of Open Parking: 261
No. of Closed Parking: 27

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 403 to 450 sq ft 118 33
2BHK 583 to 663 sq ft 48 31
Others 544 to 546 sq ft 66 20
Project Developer:
CONTINENTAL SIDHANT REALITY
Organization Type: Partnership

Address: C/O Sidhant Pride, National Saw Mills, Ram Baug Lane No 3, Phalke Compound, Kalyan, Kalyan-Dombivali (M Corp.), Thane-421302

Office Phone: +91 22497 49317


Member details:
Member Name Designation
SAUD ISMAIL FALKE Partner
RAMEEZ SHAHNAWAZ MAJEED Authorized Signatory
SANTOSH SUKHDEO GHOLAP Partner


Co-Promotors:
Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement
CONTINENTAL SIDHANT REALITY Partnership Area Share
RAMEEZ S MAJEED Partnership Revenue Share


Other Professionals involved:
Professional Name Professional Type
APICES STUDIO PRIVATE LIMITED Architect
EPICONS CONSULTANT PVT LTD Engineer
Raza Nasikar Other Professional
Abdul Qadir Kazi Other Professional
Build Strong Contractors and Engineers Contractor
Rachit Singh Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Continental Futura: A New Residential Project in Kon Gaon, Thane

Continental Futura, a new residential project by Continental Sidhant Reality, is poised to redefine living standards in the serene locale of Kon Gaon, Thane. This project, registered under the Maharashtra Real Estate Regulatory Authority (MahaRERA) with ID P51700015939, is a testament to quality construction and meticulous planning, promising a comfortable and convenient lifestyle for its residents.

Nestled amidst the picturesque landscapes of Kon Gaon, Continental Futura occupies a prime location on Kalyan Bhiwandi Road. The project encompasses a total plot area of 13250 sq. m, strategically divided into three buildings, each rising to 37 floors. The approved FSI of the project is 9637 sq.m, allowing for a substantial built-up area, while the total permissible FSI stands at 18575 sq.m, leaving room for future expansion.

Continental Futura boasts a diverse range of thoughtfully designed units, catering to the varying needs of prospective homebuyers. The project offers 118 units of 1BHK, ranging from 403 to 450 sq ft, along with 48 units of 2BHK, spanning from 583 to 663 sq ft. Additionally, 66 units of “Others” ranging from 544 to 546 sq ft offer unique living spaces, adding further variety to the project.

Beyond its impressive unit configurations, Continental Futura also prioritizes resident well-being with a wide array of amenities. The project features three plinths, two podiums, two stilts, and a significant amount of open parking spaces, accommodating 261 four-wheelers and two-wheelers. Further adding to the comfort and convenience of residents are 27 closed parking spaces, ensuring the safety and security of vehicles.

Continental Futura is a project that truly prioritizes a holistic living experience. With its meticulously planned amenities, meticulously designed units, and prime location, the project is set to become a landmark destination in Kon Gaon. Furthermore, the project is backed by the reputable developer, Continental Sidhant Reality, known for its commitment to quality and timely execution.

The project is scheduled for completion by March 30, 2024, making it an excellent investment opportunity for those seeking a well-appointed home in a thriving location. With its focus on modern living, Continental Futura promises to be more than just a residential project; it is an embodiment of a community that thrives on comfort, convenience, and a sense of belonging.

There is a change in Project timelines and the completion date is moved ahead. The project is now scheduled to complete by 2025-03-30

 

There are additions/modifications under Professionals section

Professional Name Professional Type
Rachit Singh Chartered Accountant

 

New documents listed below were uploaded to the Documents section:

  • 5 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 6 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 7 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • 8 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 5 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 6 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 7 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • 8 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)

 

New documents listed below were uploaded to the Documents section:

  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Fire Protection And Fire Safety Requirements : 90 BUILDING 1 COMPLETED
Sewerage (Chamber, Lines, Septic Tank , STP) : 100 casting of tank completed

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 95
1 Overall Percentage of Completion of the work done For the entire Building /Wing 89.5
3 X number of Basement(s) and Plinth 95
3 Overall Percentage of Completion of the work done For the entire Building /Wing 19.5

 

There are additions/modifications under Professionals section

Professional Name Professional Type
Build Strong Contractors and Engineers Contractor
Abdul Qadir Kazi Other Professional
Raza Nasikar Other Professional

 

New documents listed below were uploaded to the Documents section:

  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 1 Disclosure of Interest in Other Real Estate Organizations
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 1 Proforma of Agreement for sale

 

New documents listed below were uploaded to the Documents section:

  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)

 

New documents listed below were uploaded to the Documents section:

  • 2 Declaration in FORM B
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • 1 b Details of encumbrances concerned to Legal
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • 2 a Details of encumbrances concerned to Finance
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)

 

New documents listed below were uploaded to the Documents section:

  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 2 Disclosure of sold/ booked inventory
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Stilt Floor 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 85
1 Overall Percentage of Completion of the work done For the entire Building /Wing 88.5
2 X number of Basement(s) and Plinth 75
2 Overall Percentage of Completion of the work done For the entire Building /Wing 17.5
3 Excavation 100
3 X number of Basement(s) and Plinth 75
3 Overall Percentage of Completion of the work done For the entire Building /Wing 17.5

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 90 8 100

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Street Lighting : 50 on boundary location
Landscaping & Tree Planting : 10 pipe line and chambers completed
Storm Water Drains : 100 equipment instalation
Sewerage (Chamber, Lines, Septic Tank , STP) : 80 casting of tank completed
Water Supply : 75 awaiting water supply line from gram panchayat
Open Parking : 100 Building no1
Aggregate area of recreational Open Space : 25 Swimming pool casted and club house footing work
Electrical Meter Room, Sub-Station, Receiving Station : 80 Building no1 completed awaiting electric meter
Fire Protection And Fire Safety Requirements : 70 BUILDING 1 COMPLETED
Water Conservation, Rain water Harvesting : 100 COMPLETED

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 54.2 26 12

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [2]
  • Building Plan Approval (IOD) [5]
  • CERSAI details
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project) [2]
  • Commencement Certificates / NA Order for plotted development [2]
  • Copy of Layout Approval (in case of layout) [3]
  • Copy of the legal title report [2]
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Disclosure of sold/ booked inventory
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
  • Other
  • Proforma of Allotment letter