MH
Thane
P51700001178
RERA ID: P51700001178
Project Name: Cloud 36 -Phase I
Project Type: Residential
Project Status: On-Going Project *
* Projects that were already under development in May 2017, when RERA was implemented.
2018-12-31
Revised Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Ghansoli, Sector 11, Navi Mumbai (M Corp.), Thane-400701

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
Plot No. 6 Sector 11. Ghansoli Node

Boundaries:
Plot No 5
Plot No 9N 20 Meter Wide Road
WE
S
Plot No 7

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 7716 sq.mt.
Sanctioned Built-up Area: 13621 sq.mt.
Recreational Open Space: 3175 sq.mt.
No. of Buildings sanctioned: 3
No. of Floors sanctioned: 111
No. of Plinths: 3
No. of Podiums: 6
No. of Stilts: 3
No. of Closed Parking: 370

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 435 to 607 sq ft 188 188
3BHK 659 to 718 sq ft 64 64
Project Developer:
GeeCee Ventures Limited
Organization Type: Company

Address: 209-210 2Nd Floor, Arcadia Building, Ncpa Marg, Nariman Point, Ncpa, Mumbai City-400021

Office Phone: +91 22401 98600


Member details:
Member Name Designation
Gaurav Harisingh Shyamsukha Authorized Signatory
SURESHKUMAR VASUDEVAN VAZHATHARA Authorized Signatory


Other Professionals involved:
Professional Name Professional Type
M/s PARMA ENTERPRISE Contractor
SURYA ENGINEERING WORKS Contractor
BABULAL R. MISTRY Contractor
M/s SAHIL ARTS Contractor
M/s SHREE MOMAI ELECTRICALS Contractor
M/s EXPRESS PESTICIDES PRIVATE LIMITED Contractor
M/s SHREEJI ENTERPRISES Contractor
M/s INDIGENOUS CONTROL ELECTRICALS PVT. LTD. Contractor
M/s HEERA WATERPROOFING Contractor
M/s GAVALI ENTERPRISES Contractor
M/s VALA ENTERPRISE Contractor
M/s SAHIL INTERIOR Contractor
M/s SURENDRA ENTERPRISES Contractor
M/s SCHINDLER INDIA PVT. LTD Contractor
M/s OM SAI CONSTRUCTION Contractor
M/s PATEL COLOUR SAGAR Contractor
M/s OMAR INTERIOR Contractor
M/s WINTECH-EFP Contractor
M/s MALLICK HAFIJUL SAHAHUSSAIN Contractor
ATHARAV ENGINEERS Contractor
M/s OM SAI GANESH DECOR Contractor
OSMOSIS AUTOPUMP INDIA PVT. LTD. Contractor
AMBICA WATER PROOFING CONSTRUCTION Contractor
M/s SPARKLE CLEAN TECH PVT LTD Contractor
M/s RUBY STEEL Contractor
M/s HRISHI ELECTRICAL & ENGINEERING CO. Contractor
M/s COMPOSITE MOULDINGS Contractor
M/s MALLICK ENTERPRISES Contractor
M/s YOGESH ENTERPRISE Contractor
M/s ROYAL MICRO IRRIGATION SYSTEMS Contractor
Hafeez Contractor (Design Architect) Architect
Satish V Ahuja & Associates (Consulting Architect) Architect
Mahimtura Consultants Pvt. Ltd. Engineer
M/s Integrated technical services Other Professional
M/s Synergy Façade Consultancy Other Professional
M/s VK Environmental Other Professional
M/s Arunkumar landscape architects pvt. Ltd. Other Professional
M/s. GALAXY EARTH MOVER Contractor
M/s GATEWAY ENTERPRISES Contractor


Projects in the state by this developer:
P52000077097 - THE MIST - PHASE III - Raigarh
P52000050116 - GeeCee Emerald - Raigarh
P51800046721 - Laxmi Kunj - Mumbai Suburban
P51800027318 - PROXIMUS - Mumbai Suburban
P52000024728 - The Mist Phase II - Raigarh
P52000019788 - GeeCee Aspira 206 - Raigarh
P52000007101 - The Mist -Phase I - Raigarh
P51700004872 - Cloud 36-Phase II - Thane
P51700001178 - Cloud 36 -Phase I - Thane
Litigations

Litigations related to the project ? No

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Building Plan Approval (IOD)
  • CERSAI details
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project) [5]
  • Certificates of Architect (Form 4)
  • Certificates of CA (Form 5)
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project) [4]
  • Commencement Certificates / NA Order for plotted development [2]
  • Copy of Layout Approval (in case of layout) [26]
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Deviation Report with respect to Allotment letter
  • Deviation Report with respect to model copy of Agreement
  • Disclosure of Interest in Other Real Estate Organizations
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Foreclosure of the Project
  • Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • Other
  • Proforma of Agreement for sale
  • Proforma of Allotment letter
  • Status of Conveyance
  • Status of Formation of Legal Entity (Society/Co Op etc.) [2]
  • a Details of encumbrances concerned to Finance
  • b Details of encumbrances concerned to Legal