Project Name: CELESTE VILLAS
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-10-31
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
H No 3, Survey No 80, Kothimbe, Karjat, Raigarh-410201

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
SURVEY NO 80 H NO 3 PLOT NO 1 TO 16

Boundaries:
18 MTRS ODR ROAD
S NO 79N S NO 80 H NO 4
WE
S
S NO 80 H NO 5

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 5400 sq.mt.
Sanctioned Built-up Area: 1959 sq.mt.
Recreational Open Space: 540 sq.mt.
No. of Buildings sanctioned: 16
No. of Floors sanctioned: 32
No. of Plinths: 16

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
Bungalow 1118 to 1836 sq ft 0 0
Project Developer:
BUILD MARQUE REALTY LLP
Organization Type: Partnership

Address: Banglow No 3, Andrabis Villa, Naya Nagar, Evershine Enclave,Mira Road East, Opp Umrao Hospital, Mira-Bhayandar (M Corp.), Thane-401107

Office Phone: +91 21480 00000


Member details:
Member Name Designation
SHAHAB SAAQIB ALTAF ANDRABI SYED Partner
ZAIN ALTAF ANDRABI SAYED Partner
ZAHEER ABBAS Partner
WASIM AHMED SIDDIQUI Partner
FAZAL AHMED SHAIKH Partner
ISTYAK AHMED NABI SHAH Partner


Other Professionals involved:
Professional Name Professional Type
GANESH KRISHNA BHOIR Chartered Accountant
ANUP SURESH SALVI Architect
SHREESHAIL GAIKWAD Engineer


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Celeste Villas: A Luxurious Residential Haven in the Heart of Nature

Nestled amidst the serene landscapes of Kothimbe, Karjat, Celeste Villas promises a tranquil and opulent lifestyle. This new residential project, with RERA ID P52000050001, is developed by BUILD MARQUE REALTY LLP, a reputable partnership firm known for its commitment to quality and innovation.

Celeste Villas boasts a prime location in Survey No 80, H NO 3, offering a tranquil escape from the city’s hustle and bustle. The project spans a total area of 5400 sqmts, comprising 16 individual villas, each meticulously designed to maximize space and comfort. The project’s strategic location offers convenient access to essential amenities while maintaining a serene atmosphere.

The project’s design focuses on incorporating sustainable and modern features, incorporating a generous 540 sqmts of recreational open space, ensuring a healthy and harmonious living experience for residents. With a total sanctioned FSI of 1959, each villa provides ample living space, offering a perfect blend of luxury and functionality.

Celeste Villas is designed for those seeking a luxurious escape, with 16 plinth levels and 32 sanctioned floors, offering breathtaking views of the surrounding natural beauty. The project promises a plethora of amenities, ensuring a comfortable and enriching lifestyle for its residents.

Key Project Highlights:

  • RERA Approved Project: Ensures transparency and accountability
  • Prime Location: Serene location in Kothimbe, Karjat
  • Spacious Villas: Varied sizes from 1118 to 1836 sq ft
  • Luxurious Amenities: Recreational open space and modern design
  • Sustainable Features: A commitment to environmental responsibility
  • Reputable Developer: BUILD MARQUE REALTY LLP, known for quality

Celeste Villas is more than just a residential development; it’s an opportunity to embrace a life of luxury and tranquility amidst nature’s embrace. With its focus on quality, sustainability, and luxurious living, Celeste Villas is poised to become a coveted address in the picturesque region of Karjat.

New documents listed below were uploaded to the Documents section:

  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)

 

New documents listed below were uploaded to the Documents section:

  • 1 Disclosure of sold/ booked inventory

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Street Lighting : 30 -
Landscaping & Tree Planting : 30 -
Storm Water Drains : 30 -

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Excavation 40
1 X number of Basement(s) and Plinth 40
1 X number of Slabs of Super Structure 40
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
1 Overall Percentage of Completion of the work done For the entire Building /Wing 32
2 Excavation 40
2 X number of Basement(s) and Plinth 40
2 X number of Slabs of Super Structure 40
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
2 Overall Percentage of Completion of the work done For the entire Building /Wing 32
3 Excavation 40
3 X number of Basement(s) and Plinth 40
3 X number of Slabs of Super Structure 40
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
3 Overall Percentage of Completion of the work done For the entire Building /Wing 32
4 Excavation 40
4 X number of Basement(s) and Plinth 40
4 X number of Slabs of Super Structure 40
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
4 Overall Percentage of Completion of the work done For the entire Building /Wing 32
5 Excavation 40
5 X number of Basement(s) and Plinth 40
5 X number of Slabs of Super Structure 40
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
5 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
5 Overall Percentage of Completion of the work done For the entire Building /Wing 32
6 Excavation 40
6 X number of Basement(s) and Plinth 40
6 X number of Slabs of Super Structure 40
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
6 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
6 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
6 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
6 Overall Percentage of Completion of the work done For the entire Building /Wing 32
7 Excavation 40
7 X number of Basement(s) and Plinth 40
7 X number of Slabs of Super Structure 40
7 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
7 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
7 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
7 Overall Percentage of Completion of the work done For the entire Building /Wing 32
8 Excavation 40
8 X number of Basement(s) and Plinth 40
8 X number of Slabs of Super Structure 40
8 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
8 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
8 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
8 Overall Percentage of Completion of the work done For the entire Building /Wing 32
9 Excavation 40
9 X number of Basement(s) and Plinth 40
9 X number of Slabs of Super Structure 40
9 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
9 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
9 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
9 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
9 Overall Percentage of Completion of the work done For the entire Building /Wing 32
10 Excavation 40
10 X number of Basement(s) and Plinth 40
10 X number of Slabs of Super Structure 40
10 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
10 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
10 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
10 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
10 Overall Percentage of Completion of the work done For the entire Building /Wing 32
11 Excavation 40
11 X number of Basement(s) and Plinth 40
11 X number of Slabs of Super Structure 40
11 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
11 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
11 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
11 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
11 Overall Percentage of Completion of the work done For the entire Building /Wing 32
12 Excavation 40
12 X number of Basement(s) and Plinth 40
12 X number of Slabs of Super Structure 40
12 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
12 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
12 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
12 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
12 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
12 Overall Percentage of Completion of the work done For the entire Building /Wing 32
13 Excavation 40
13 X number of Basement(s) and Plinth 40
13 X number of Slabs of Super Structure 40
13 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
13 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
13 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
13 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
13 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
13 Overall Percentage of Completion of the work done For the entire Building /Wing 32
14 Excavation 40
14 X number of Basement(s) and Plinth 40
14 X number of Slabs of Super Structure 40
14 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
14 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
14 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
14 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
14 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
14 Overall Percentage of Completion of the work done For the entire Building /Wing 32
15 Excavation 40
15 X number of Basement(s) and Plinth 40
15 X number of Slabs of Super Structure 40
15 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
15 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
15 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
15 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
15 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
15 Overall Percentage of Completion of the work done For the entire Building /Wing 32
16 Excavation 40
16 X number of Basement(s) and Plinth 40
16 X number of Slabs of Super Structure 40
16 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
16 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
16 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
16 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 40
16 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
16 Overall Percentage of Completion of the work done For the entire Building /Wing 32

 

New documents listed below were uploaded to the Documents section:

  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Building/Plot Details section updated for field(s) as below:

Field updated New value
Number of Plinth 16
Number of Sanctioned Floors 32

 

New documents listed below were uploaded to the Documents section:

  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Community Buildings : 50 -
Sewerage (Chamber, Lines, Septic Tank , STP) : 10 -

 

New documents listed below were uploaded to the Documents section:

  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Excavation 30
1 X number of Basement(s) and Plinth 30
1 X number of Slabs of Super Structure 30
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
1 Overall Percentage of Completion of the work done For the entire Building /Wing 24
2 Excavation 30
2 X number of Basement(s) and Plinth 30
2 X number of Slabs of Super Structure 30
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
2 Overall Percentage of Completion of the work done For the entire Building /Wing 24
3 Excavation 30
3 X number of Basement(s) and Plinth 30
3 X number of Slabs of Super Structure 30
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
3 Overall Percentage of Completion of the work done For the entire Building /Wing 24
4 Excavation 30
4 X number of Basement(s) and Plinth 30
4 X number of Slabs of Super Structure 30
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
4 Overall Percentage of Completion of the work done For the entire Building /Wing 24
5 Excavation 30
5 X number of Basement(s) and Plinth 30
5 X number of Slabs of Super Structure 30
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
5 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
5 Overall Percentage of Completion of the work done For the entire Building /Wing 24
6 Excavation 30
6 X number of Basement(s) and Plinth 30
6 X number of Slabs of Super Structure 30
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
6 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
6 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
6 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
6 Overall Percentage of Completion of the work done For the entire Building /Wing 24
7 Excavation 30
7 X number of Basement(s) and Plinth 30
7 X number of Slabs of Super Structure 30
7 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
7 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
7 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
7 Overall Percentage of Completion of the work done For the entire Building /Wing 24
8 Excavation 30
8 X number of Basement(s) and Plinth 30
8 X number of Slabs of Super Structure 30
8 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
8 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
8 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
8 Overall Percentage of Completion of the work done For the entire Building /Wing 24
9 Excavation 30
9 X number of Basement(s) and Plinth 30
9 X number of Slabs of Super Structure 30
9 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
9 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
9 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
9 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
9 Overall Percentage of Completion of the work done For the entire Building /Wing 24
10 Excavation 30
10 X number of Basement(s) and Plinth 30
10 X number of Slabs of Super Structure 30
10 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
10 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
10 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
10 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
10 Overall Percentage of Completion of the work done For the entire Building /Wing 24
11 Excavation 30
11 X number of Basement(s) and Plinth 30
11 X number of Slabs of Super Structure 30
11 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
11 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
11 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
11 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
11 Overall Percentage of Completion of the work done For the entire Building /Wing 24
12 Excavation 30
12 X number of Basement(s) and Plinth 30
12 X number of Slabs of Super Structure 30
12 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
12 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
12 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
12 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
12 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
12 Overall Percentage of Completion of the work done For the entire Building /Wing 24
13 Excavation 30
13 X number of Basement(s) and Plinth 30
13 X number of Slabs of Super Structure 30
13 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
13 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
13 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
13 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
13 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
13 Overall Percentage of Completion of the work done For the entire Building /Wing 24
14 Excavation 30
14 X number of Basement(s) and Plinth 30
14 X number of Slabs of Super Structure 30
14 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
14 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
14 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
14 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
14 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
14 Overall Percentage of Completion of the work done For the entire Building /Wing 24
15 Excavation 30
15 X number of Basement(s) and Plinth 30
15 X number of Slabs of Super Structure 30
15 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
15 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
15 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
15 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
15 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
15 Overall Percentage of Completion of the work done For the entire Building /Wing 24
16 Excavation 30
16 X number of Basement(s) and Plinth 30
16 X number of Slabs of Super Structure 30
16 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
16 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
16 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
16 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 30
16 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
16 Overall Percentage of Completion of the work done For the entire Building /Wing 24

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • Building Plan Approval / NA Order for plotted development
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B [7]
  • Deviation Report with respect to Allotment letter
  • Deviation Report with respect to model copy of Agreement
  • Disclosure of Interest in Other Real Estate Organizations [7]
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • Proforma of Agreement for sale
  • Proforma of Allotment letter
  • a Details of encumbrances concerned to Finance [2]
  • b Details of encumbrances concerned to Legal [2]