RERA ID: P52000029513
Project Name: OSCAR HEIGHTS
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2027-12-30
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Pen, Cts No 54A, 54B, 55, 56, 57, 58, 67, 68A & Final Plot 30 A, Pen Rural, Raigarh-402107

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
CTS NO 54A,54B,55,56,57,58,67, AND FINAL PLOT 30 -A

Boundaries:
9 MTR WIDE ROAD FINAL PLOT 30B 30
FINAL PLOT NO 30 FINAL PLOT 23N FINAL PLOT NO 30 B CTS NO 52 CTS NO 68A
WE
S
CTS 66 ADJACENT LANE CTS NO 65

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 4710 sq.mt.
Sanctioned Built-up Area: 14667 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 8
No. of Floors sanctioned: 64
No. of Plinths: 8
No. of Stilts: 8
No. of Open Parking: 74
No. of Closed Parking: 8

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 400 to 448 sq ft 168 60
2BHK 583 to 708 sq ft 77 12
Project Developer:
OSCAR BUILDERS
Organization Type: Partnership

Address: C/0 House No 135, Iqbal Manzil, At Post, Taloje, Taloja, Taloje Panchnad, Panvel, Raigarh-410208

Office Phone: +91 90044 20010


Member details:
Member Name Designation
ZIYAUDDIN PATEL Authorized Signatory
ZIYAUDDIN PATEL Partner
MANSI VANAGE Partner
WASIM PATEL Partner


Other Professionals involved:
Professional Name Professional Type
KEYUR BHAYANI Chartered Accountant
SACHIN GHARAT Architect
SOLKAR CONSULTANTS Engineer
CA Shraddha Anant Paranjape Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Oscar Heights: A New Residential Project in Pen, Raigarh

Oscar Heights, a new residential project in Pen, Raigarh, Maharashtra, promises a unique living experience. With RERA ID P52000029513, the project is developed by Oscar Builders, a partnership firm, and is currently under construction, with an anticipated completion date of December 30, 2027.

Located in the heart of Pen, Oscar Heights occupies a prime plot of land spanning 4710 square meters. The project comprises 8 buildings, each with 64 floors, and a total of 74 open parking spaces for both four-wheelers and two-wheelers. The project also offers 8 closed parking spaces, catering to the specific needs of residents.

Oscar Heights is a meticulously planned development, with a sanctioned FSI of 14667, ensuring ample space and a comfortable lifestyle for residents. The project is strategically situated in a well-connected location with easy access to essential amenities like schools, hospitals, and shopping centers.

The project’s location boasts a tranquil setting, offering a peaceful escape from the hustle and bustle of city life. The surrounding green spaces and serene environment promote a sense of well-being and provide a healthy living environment for residents.

Oscar Heights is an excellent investment opportunity for individuals seeking a comfortable and secure living space in a rapidly developing area. The project’s strategic location, coupled with its comprehensive amenities and well-designed infrastructure, makes it a highly desirable option for families, working professionals, and investors.

For further information and to explore the various apartment options available, interested parties are encouraged to contact Oscar Builders at 9004420010 or visit their office located at C/o House No 135, Iqbal Manzil, At Post Taloje Panchnad, Taloje, Raigarh, Maharashtra, 410208.

The RERA designated separate bank account details have been modified. The new details are: Bank Name: Axis Bank IFSC Code: UTIB0004721

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Sewerage (Chamber, Lines, Septic Tank , STP) : 30 WORK NOT STARTED

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Excavation 30
1 Overall Percentage of Completion of the work done For the entire Building /Wing 3
2 Excavation 30
2 Overall Percentage of Completion of the work done For the entire Building /Wing 3
3 Excavation 30
3 Overall Percentage of Completion of the work done For the entire Building /Wing 3
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
4 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 70
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 88
4 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
4 Overall Percentage of Completion of the work done For the entire Building /Wing 77.8
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
5 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 70
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 88
5 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
5 Overall Percentage of Completion of the work done For the entire Building /Wing 77.8
6 X number of Slabs of Super Structure 70
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
6 Overall Percentage of Completion of the work done For the entire Building /Wing 42
7 X number of Slabs of Super Structure 70
7 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
7 Overall Percentage of Completion of the work done For the entire Building /Wing 42
8 X number of Slabs of Super Structure 70
8 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
8 Overall Percentage of Completion of the work done For the entire Building /Wing 42

 

New documents listed below were uploaded to the Documents section:

  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 2 Disclosure of sold/ booked inventory
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)

 

There are additions/modifications under Professionals section

Professional Name Professional Type
CA Shraddha Anant Paranjape Chartered Accountant

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 38.47 42 19

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 40.46 21 6
1BHK 40.89 7 3
1BHK 41.1 7 2

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 38.47 42 17
1BHK 38.48 63 23

 

New documents listed below were uploaded to the Documents section:

  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
4 Excavation 100
4 X number of Basement(s) and Plinth 100
4 Stilt Floor 100
4 X number of Slabs of Super Structure 100
4 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
4 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
4 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
4 Overall Percentage of Completion of the work done For the entire Building /Wing 60
5 Excavation 100
5 X number of Basement(s) and Plinth 100
5 Stilt Floor 100
5 X number of Slabs of Super Structure 100
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
5 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
5 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 50
5 Overall Percentage of Completion of the work done For the entire Building /Wing 60
6 Excavation 100
6 X number of Basement(s) and Plinth 100
6 Stilt Floor 100
6 X number of Slabs of Super Structure 30
6 Overall Percentage of Completion of the work done For the entire Building /Wing 33
7 Excavation 100
7 X number of Basement(s) and Plinth 100
7 Stilt Floor 100
7 X number of Slabs of Super Structure 30
7 Overall Percentage of Completion of the work done For the entire Building /Wing 33
8 Excavation 100
8 X number of Basement(s) and Plinth 100
8 Stilt Floor 100
8 X number of Slabs of Super Structure 30
8 Overall Percentage of Completion of the work done For the entire Building /Wing 33

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 38.35 7 7
1BHK 38.47 42 15
1BHK 38.48 63 20
1BHK 40.46 21 2
1BHK 40.89 7 1
1BHK 41.1 7 1
2BHK 58.61 14 7
2BHK 58.63 7 2
2BHK 65.78 7 3

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Community Buildings : 5 WORK YET NOT COMPLETED

 

New documents listed below were uploaded to the Documents section:

  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • Building Plan Approval / NA Order for plotted development
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Disclosure of sold/ booked inventory
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • Proforma of Allotment letter [2]