MH
Raigarh
P52000021082
RERA ID: P52000021082
Project Name: wise city, south Block, Phase I, Plot RZ8 Building 1 wing A3
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2026-12-30
Proposed Date of Completion
 


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Wadhwa Wise City, 36 M Wide Dp Road, Wardoli, Panvel, Raigarh-410206

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
1286, 1288

Boundaries:
36 M wide DP road
36 M wide DP roadN Future Development
WE
S
ayout boundary Plot RZ8 building 1 wing A2

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 559 sq.mt.
Sanctioned Built-up Area: 3256 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 26
No. of Plinths: 1

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 389 to 435 sq ft 205 90
2BHK 639 to 645 sq ft 48 30
Project Developer:
Wadhwa Construction and Infrastructure Private Limited
Organization Type: Company

Address: 301, 3Rd Floor, C-59, Platina, Mmrda Road, G-Block, Bandra Kurla Complex, Above Ferrari Showroom, Kurla, Mumbai Suburban-400098

Office Phone: +91 22395 78400
Website URL: www.thewadhwagroup.com


Member details:
Member Name Designation
Manohar Moolchand Chhabria Authorized Signatory
Navin Amarlal Makhija Director
Manohar Moolchand Chhabria Director


Co-Promotors:
Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement
VALUABLE PROPERTIES PRIVATE LIMITED Company Revenue Share


Other Professionals involved:
Professional Name Professional Type
Capacite Infra Project Pvt Ltd Contractor
Hiten Sethi Acsociates Architect
S R Estimate Engineer
GmJ & Co Chartered Accountant
Mr Pragnesh Mehta Other Professional
Visionary Design Architects Architect


Projects in the state by this developer:
P52000048913 - Wise City RZ-02 Plotted Development - Raigarh
P52000048906 - Wise City RZ-03 Plotted Development - Raigarh
P52000021746 - Magnolia Cluster 4 - Raigarh
P52000021144 - Magnolia Cluster 3 - Raigarh
P52000021143 - Magnolia Cluster 1 - Raigarh
P52000021142 - Magnolia Cluster 2 - Raigarh
P52000021106 - Wise City, South Block Phase I, Plot RZ8 Building 1 Wing A2 - Raigarh
P52000021082 - wise city, south Block, Phase I, Plot RZ8 Building 1 wing A3 - Raigarh
P52000021081 - Wise City, South Block, Phase I,Plot RZ8 Building 4 Wing F2 - Raigarh
P52000020858 - Wise City, South Block, Phase I,Plot RZ8 Building 5 Wing D5 - Raigarh
…and 12 more
Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Wise City: A New Chapter in Luxury Living

Wadhwa Construction and Infrastructure Private Limited, a renowned name in the real estate landscape, is excited to unveil “Wise City,” a new residential project in the heart of Wardoli, Raigarh, Maharashtra. This project, registered with the Maharashtra Real Estate Regulatory Authority (MahaRERA) under the ID P52000021082, promises to redefine urban living with its luxurious amenities, strategic location, and meticulous construction.

Located in the coveted “Wadhwa Wise City” locality, this Phase I development encompasses Plot RZ8, Building 1, Wing A3, spanning a total plot area of 559 square meters. The project boasts a single building with 26 sanctioned floors, rising majestically above a single plinth. This new project, expected to be completed by December 30th, 2026, is designed to cater to the discerning homeowner seeking a seamless blend of modern living and serene surroundings.

Strategically positioned within the broader “Wise City” development, this project enjoys a prime location. Bounded by a 36-meter wide DP road to the west and north, it is easily accessible and offers convenient connectivity. The development also benefits from proximity to future developments to the east and the neighboring Plot RZ8, Building 1, Wing A2 to the south.

This thoughtfully designed project adheres to strict building regulations. The sanctioned FSI of 3256 allows for a substantial built-up area, and the total permissible FSI of 15278 ensures ample space for both residential and recreational amenities.

While the project boasts a modern design, it prioritizes sustainability and responsible development. The project currently does not incorporate any planned recreational open spaces; however, Wadhwa Construction and Infrastructure Private Limited is committed to creating a vibrant and thriving community that caters to the needs of its residents.

“Wise City” represents Wadhwa’s commitment to creating luxurious living experiences that are both sustainable and enriching. With its strategic location, meticulous planning, and commitment to quality, “Wise City” is poised to become a landmark development, offering residents a lifestyle of unparalleled comfort and convenience.

New documents listed below were uploaded to the Documents section:

  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 9 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 36.15 93 31
1BHK 36.25 52 17
1BHK 40.44 50 33
2BHK 59.41 42 25

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Basement(s) and Plinth 100
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 36
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 65
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 68
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 49
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 42
1 Overall Percentage of Completion of the work done For the entire Building /Wing 56

 

New documents listed below were uploaded to the Documents section:

  • 8 Disclosure of sold/ booked inventory
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)

 

New documents listed below were uploaded to the Documents section:

  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 36.15 93 31
1BHK 36.25 52 17
1BHK 36.64 10 9
1BHK 40.44 50 33
2BHK 59.41 42 25
2BHK 59.94 6 5

 

New documents listed below were uploaded to the Documents section:

  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

New documents listed below were uploaded to the Documents section:

  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)

 

New documents listed below were uploaded to the Documents section:

  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21) [2]
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [10]
  • Building Plan Approval (IOD) [2]
  • Commencement Certificates / NA Order for plotted development [5]
  • Copy of Layout Approval (in case of layout) [4]
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B [4]
  • Details of encumbrances [2]
  • Disclosure of sold/ booked inventory [7]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20) [2]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) [3]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) [4]
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [13]
  • Other [2]
  • Proforma of Agreement for sale
  • Proforma of Allotment letter [2]