1 |
Excavation |
100 |
1 |
X number of Basement(s) and Plinth |
100 |
1 |
X number of Podiums |
17 |
1 |
Stilt Floor |
50 |
1 |
X number of Slabs of Super Structure |
22 |
1 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
1 |
1 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
10 |
1 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
30.4 |
2 |
Excavation |
100 |
2 |
X number of Basement(s) and Plinth |
100 |
2 |
X number of Podiums |
17 |
2 |
Stilt Floor |
50 |
2 |
X number of Slabs of Super Structure |
37 |
2 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
5 |
2 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
5 |
2 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
10 |
2 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
1 |
2 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
32.6 |
3 |
Excavation |
100 |
3 |
X number of Basement(s) and Plinth |
100 |
3 |
X number of Podiums |
17 |
3 |
Stilt Floor |
50 |
3 |
X number of Slabs of Super Structure |
35 |
3 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
6 |
3 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
10 |
3 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
1 |
3 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
32.2 |
4 |
Excavation |
100 |
4 |
X number of Basement(s) and Plinth |
100 |
4 |
X number of Podiums |
17 |
4 |
X number of Slabs of Super Structure |
47 |
4 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
8 |
4 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
11 |
4 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
13 |
4 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
3 |
4 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
39 |
5 |
Excavation |
100 |
5 |
X number of Basement(s) and Plinth |
100 |
5 |
X number of Podiums |
17 |
5 |
Stilt Floor |
50 |
5 |
X number of Slabs of Super Structure |
23 |
5 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
1 |
5 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
10 |
5 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
30.4 |
6 |
Excavation |
100 |
6 |
X number of Basement(s) and Plinth |
100 |
6 |
X number of Podiums |
17 |
6 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
40 |
6 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
34.1 |
7 |
Excavation |
0 |
7 |
X number of Basement(s) and Plinth |
0 |
7 |
X number of Podiums |
0 |
7 |
Stilt Floor |
0 |
7 |
X number of Slabs of Super Structure |
0 |
7 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
0 |
7 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
0 |
7 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
0 |
7 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
0 |
7 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
0 |
7 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
0 |
8 |
Excavation |
0 |
8 |
X number of Basement(s) and Plinth |
0 |
8 |
X number of Podiums |
0 |
8 |
Stilt Floor |
0 |
8 |
X number of Slabs of Super Structure |
0 |
8 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
0 |
8 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
0 |
8 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
0 |
8 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
0 |
8 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
0 |
8 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
0 |
9 |
Excavation |
0 |
9 |
X number of Basement(s) and Plinth |
0 |
9 |
X number of Podiums |
0 |
9 |
Stilt Floor |
0 |
9 |
X number of Slabs of Super Structure |
0 |
9 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
0 |
9 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
0 |
9 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
0 |
9 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
0 |
9 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
0 |
9 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
0 |
10 |
Excavation |
0 |
10 |
X number of Basement(s) and Plinth |
0 |
10 |
X number of Podiums |
0 |
10 |
Stilt Floor |
0 |
10 |
X number of Slabs of Super Structure |
0 |
10 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
0 |
10 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
0 |
10 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
0 |
10 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
0 |
10 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
0 |
10 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
0 |
11 |
Excavation |
0 |
11 |
X number of Basement(s) and Plinth |
0 |
11 |
X number of Podiums |
0 |
11 |
Stilt Floor |
0 |
11 |
X number of Slabs of Super Structure |
0 |
11 |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
0 |
11 |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
0 |
11 |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
0 |
11 |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
0 |
11 |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
0 |
11 |
Overall Percentage of Completion of the work done For the entire Building /Wing |
0 |