2024-09-30
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Handewadi Chowk, S.No 2/1/1, 5/6/1, 5/6/3, 5/6/4, Hadapsar Handewadi Road, Ouatade Handewadi, Haveli, Pune-411028

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
2/1/1, 5/6/1, 5/6/3, 5/6/4, 5/6/7

Boundaries:
BY SURVEY NO 6
BY SURVEY NO 2N BY SURVEY NO 4A ATRIA CONSTRUCTION
WE
S
BY SURVEY NO 2

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 5300 sq.mt.
Sanctioned Built-up Area: 4481 sq.mt.
Recreational Open Space: 530 sq.mt.
No. of Buildings sanctioned: 3
No. of Floors sanctioned: 28
No. of Plinths: 3
No. of Stilts: 3
No. of Open Parking: 324
No. of Closed Parking: 3

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 431 to 575 sq ft 112 72
Project Developer:
Atria Constructions
Organization Type: Partnership

Address: 440/441, Pgi Building, Laxmi Road, Nana Peth, Quarter Gate, Pune (M Corp.), Pune City, Pune-411002

Office Phone: +91 20243 76474
Website URL: WWW.ATRIA.CO.IN


Member details:
Member Name Designation
Sambhaji Raghunath Tupe Partner
Anil Ramalinga Reddy Partner
Anil Ramalinga Reddy Authorized Signatory
Manjusha Dhananjay Thite Partner
Dhananjay Nivrutti Thite Partner
Vaishali Sanjayrao Holkar Partner
Dhananjay Nivrutti Thite Authorized Signatory
Jitendra Dilip Shinde Partner


Other Professionals involved:
Professional Name Professional Type
Vilas Tarwadi Architect
Ravindrasing Patil Engineer
Nikita Bajaj Chartered Accountant
SPCM Associates Chartered Accountant
VIJAY CONSTRUCTION Contractor
Bhagyaraj Electricals Contractor
MOHPATRA CONTRACTOR Contractor
Prime Enterprises Contractor
Pradeep Devarshetti and Associates Architect
G A BHILARE AND ASSOCIATES Other Professional
Rajiv Patel and Associates Other Professional


Projects in the state by this developer:
P52100047761 - RAJGRUHI RESIDENCY TOWER C1 - Pune
P52100034436 - RAJGRUHI RESIDENCY TOWER D - Pune
P52100031323 - DHANASHREE AANAND 2 - Pune
P52100031055 - DHANASHREE AANAND 1 - Pune
P52100015620 - ATRIA GRANDE PROJECT B - Pune
P52100000580 - ATRIA GRANDE PROJECT A - Pune
Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Dhanashree Anand 1: A New Residential Project in Pune’s Prime Location

Atria Constructions, a well-established partnership firm, is proud to present Dhanashree Anand 1, a new residential project located in the heart of Handewadi Chowk, Pune. This RERA-registered project (RERA ID: P52100031055) promises a luxurious and comfortable living experience with its strategic location and thoughtfully designed amenities.

Dhanashree Anand 1 is situated on a sprawling 5300 square meter plot, spanning across survey numbers 2/1/1, 5/6/1, 5/6/3, 5/6/4, and 5/6/7. The project is strategically positioned with its boundaries defined by Survey No. 4A Atria Construction (East), Survey No. 2 (West and South), and Survey No. 6 (North). This prime location offers easy access to key amenities, such as schools, hospitals, shopping malls, and entertainment hubs, ensuring a convenient and fulfilling lifestyle.

The project comprises three proposed buildings, all of which have been sanctioned and are currently under construction. Dhanashree Anand 1 offers a generous 530 square meters of recreational open space, ensuring a serene environment for residents. The project boasts a sanctioned FSI of 4481, allowing for spacious and well-designed apartments. With a total of 28 floors, including 3 stilts and 3 plinth levels, Dhanashree Anand 1 provides ample space for residents to enjoy a luxurious lifestyle.

The project offers a combination of open and closed parking options, accommodating a total of 327 vehicles. This ensures a hassle-free experience for residents with ample parking space for both 4-wheelers and 2-wheelers.

Dhanashree Anand 1 is scheduled to be completed by September 30th, 2024. With a strong commitment to quality construction and a transparent approach, Atria Constructions ensures a seamless and enjoyable experience for residents throughout the project’s lifecycle.

Dhanashree Anand 1, with its strategic location, thoughtfully designed amenities, and commitment to quality construction, promises a luxurious and fulfilling lifestyle for its residents. To learn more about this exciting new project, please visit Atria Constructions’ website at WWW.ATRIA.CO.IN or contact them directly at 2024376474.

New documents listed below were uploaded to the Documents section:

  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 40.07 1 1
2BHK 53.23 8 8
2BHK 53.36 18 10

 

New documents listed below were uploaded to the Documents section:

  • 2 Status of Formation of Legal Entity (Society/Co Op etc.)
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)
  • 1 Architect’s Certificate on Completion of Project (Form 4)
  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 40.07 1 0
2BHK 40.28 2 2
2BHK 53.15 20 14
2BHK 53.23 8 6
2BHK 53.26 9 4
2BHK 53.35 17 10
2BHK 53.36 18 9
2BHK 53.43 37 23

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Internal Roads & Footpaths : 100 As Per Drawing No Foothpath
Water Conservation, Rain water Harvesting : 100 As Per Consultant Drawing
Energy management : 100 As Per Consultant Drawing
Fire Protection And Fire Safety Requirements : 100 As Per Consultant Drawing
Electrical Meter Room, Sub-Station, Receiving Station : 100 As Per Consultant Drawing
Aggregate area of recreational Open Space : 100 As Per Sanction Drawing
Open Parking : 100 As Per Sanction Layout
Water Supply : 100 As Per Consultant Drawing
Sewerage (Chamber, Lines, Septic Tank , STP) : 100 Laid Pipes for Drainage
Landscaping & Tree Planting : 100 Planted Trees along Compound
Street Lighting : 100 As Per Drawing
Community Buildings : 100 As Per Sanction Drawing
Treatment And Disposal Of Sewage And Sullage Water : 100 As Per Sanction Drawing
Solid Waste Management And Disposal : 100 WORK NOT STARTED
Storm Water Drains : 100 Laid Pipes

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 40.28 2 2
2BHK 53.15 20 14
2BHK 53.23 8 6
2BHK 53.26 9 4
2BHK 53.35 17 10
2BHK 53.36 18 9
2BHK 53.43 37 23

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 90
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
2 Overall Percentage of Completion of the work done For the entire Building /Wing 90
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
3 Overall Percentage of Completion of the work done For the entire Building /Wing 90

 

New documents listed below were uploaded to the Documents section:

  • 4 Disclosure of sold/ booked inventory
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 94 0 100

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
1 Overall Percentage of Completion of the work done For the entire Building /Wing 83
2 X number of Slabs of Super Structure 100
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
2 Overall Percentage of Completion of the work done For the entire Building /Wing 83
3 X number of Slabs of Super Structure 100
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 90
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
3 Overall Percentage of Completion of the work done For the entire Building /Wing 87

 

New documents listed below were uploaded to the Documents section:

  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 3 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 40.07 1 0
2BHK 40.28 2 1
2BHK 53.15 20 5
2BHK 53.23 8 0
2BHK 53.26 9 2
2BHK 53.35 17 2
2BHK 53.36 18 3
2BHK 53.43 37 15

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Solid Waste Management And Disposal : 50 WORK NOT STARTED
Treatment And Disposal Of Sewage And Sullage Water : 30 As Per Sanction Drawing
Community Buildings : 60 As Per Sanction Drawing
Street Lighting : 50 As Per Drawing
Open Parking : 50 As Per Sanction Layout
Aggregate area of recreational Open Space : 75 As Per Sanction Drawing
Internal Roads & Footpaths : 25 As Per Drawing No Foothpath
Water Conservation, Rain water Harvesting : 50 As Per Consultant Drawing
Fire Protection And Fire Safety Requirements : 95 As Per Consultant Drawing
Electrical Meter Room, Sub-Station, Receiving Station : 95 As Per Consultant Drawing

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [8]
  • Building Plan Approval / NA Order for plotted development [16]
  • Commencement Certificates / NA Order for plotted development [3]
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report [2]
  • Declaration about Commencement Certificate
  • Declaration in FORM B [2]
  • Details of encumbrances [2]
  • Disclosure of sold/ booked inventory [2]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) [7]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [8]
  • Proforma of Allotment letter [2]