Project Name: HIMALAYA SUNSHINE
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2024-06-30
Extended Date of Completion
The project missed completion date 1 time(s) earlier (2023-12-30).
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
, Nagpur (M Corp.), Nagpur (Urban), Nagpur-440023

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
KHASRA NO 38 CITY SURVEY NO 270 AND SHEET NO 64 MOUZA DABHA NAGPUR

Boundaries:
KHASRA NO 17
KHASRA NO 36 AND 37N KHASRA NO 39-1 and 39-2 and 40
WE
S
12mt WIDE ROAD

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 8638 sq.mt.
Sanctioned Built-up Area: 1766 sq.mt.
Recreational Open Space: 4902 sq.mt.
No. of Buildings sanctioned: 12
No. of Floors sanctioned: 145
No. of Plinths: 58
No. of Open Parking: 61

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
Bungalow 1598 to 2274 sq ft 14 14
Others 1010 to 1925 sq ft 43 40
Plot 1614 to 2718 sq ft 7 1
Project Developer:
HIMALAYA INFRAPROJECTS SUNSHINE
Organization Type: Others (ASSOCIATION OF PERSONS)

Address: Plot No 189, Himalaya Infra Projects Office, Cement Road, Shivaji Nagar, Near Ram Nagar Square, Nagpur (M Corp.), Nagpur (Urban), Nagpur-440010

Office Phone: +91 71225 26176
Website URL: www.himalayainfra.com


Other Professionals involved:
Professional Name Professional Type
RUPESH NAOGHARE Architect
P S PATANKAR Engineer


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Himalaya Sunshine: A New Residential Development in Nagpur

Himalaya Sunshine, a new residential project in the heart of Nagpur, is poised to redefine urban living with its innovative design and commitment to quality. Developed by Himalaya Infraprojects Sunshine, an association of persons with a proven track record, this project offers a diverse range of housing options, catering to the needs of individuals and families alike.

Located in the prestigious area of Nagpur (M Corp.) with a pin code of 440023, Himalaya Sunshine occupies a sprawling 8638 sq. meters of prime land. Situated between KHASRA NO 38, CITY SURVEY NO 270, and SHEET NO 64 of MOUZA DABHA NAGPUR, the project boasts a strategic location with easy access to vital amenities and infrastructure. The development’s boundaries further enhance its desirability, with KHASRA NO 39-1 and 39-2, 40 to the east, KHASRA NO 36 and 37 to the west, KHASRA NO 17 to the north, and a 12mt wide road to the south.

Himalaya Sunshine is a comprehensive project with a total of 64 proposed buildings, with 12 sanctioned and ready for construction. The project’s focus on green living is evident in the dedicated 4902 sq. meters of recreational open space, offering residents a tranquil escape within the bustling city. The project boasts a sanctioned FSI of 1766, translating to 1766 sq. meters of built-up area, with a permissible total FSI of 9616 for the entire plot.

The project is designed to cater to a diverse range of preferences, offering 14 bungalows ranging from 1598 to 2274 sq. ft., 43 other housing units sized between 1010 and 1925 sq. ft., and 7 plots spanning 1614 to 2718 sq. ft. The project further includes 58 plinths and a total of 145 sanctioned floors, with 61 parking spaces for both cars and two-wheelers.

Himalaya Sunshine is a testament to Himalaya Infraprojects Sunshine’s commitment to quality and customer satisfaction. With its ideal location, comprehensive amenities, and diverse housing options, the project presents a unique opportunity for discerning individuals and families seeking a comfortable and fulfilling lifestyle.

For further information, please visit the project website at www.himalayainfra.com or contact the developers at 7122526176.

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
58 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
58 Overall Percentage of Completion of the work done For the entire Building /Wing 60
60 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
60 Overall Percentage of Completion of the work done For the entire Building /Wing 60
62 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
62 Overall Percentage of Completion of the work done For the entire Building /Wing 60
63 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
63 Overall Percentage of Completion of the work done For the entire Building /Wing 60

 

New documents listed below were uploaded to the Documents section:

  • 5 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • 8 Disclosure of sold/ booked inventory
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
56 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
56 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
56 Overall Percentage of Completion of the work done For the entire Building /Wing 60
57 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
57 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
57 Overall Percentage of Completion of the work done For the entire Building /Wing 60
58 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 75
58 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
58 Overall Percentage of Completion of the work done For the entire Building /Wing 57.5
59 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
59 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
59 Overall Percentage of Completion of the work done For the entire Building /Wing 60
60 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 75
60 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
60 Overall Percentage of Completion of the work done For the entire Building /Wing 57.5
61 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
61 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
61 Overall Percentage of Completion of the work done For the entire Building /Wing 60
62 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 75
62 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
62 Overall Percentage of Completion of the work done For the entire Building /Wing 57.5
63 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 75
63 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
63 Overall Percentage of Completion of the work done For the entire Building /Wing 57.5

 

New documents listed below were uploaded to the Documents section:

  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 5 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 7 Disclosure of sold/ booked inventory

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
34 X number of Basement(s) and Plinth 0
34 X number of Podiums 0
34 Stilt Floor 0
34 X number of Slabs of Super Structure 100
34 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
34 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
34 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
34 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
34 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
34 Overall Percentage of Completion of the work done For the entire Building /Wing 70
51 X number of Basement(s) and Plinth 0
51 X number of Slabs of Super Structure 100
51 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
51 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
51 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
51 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
51 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
51 Overall Percentage of Completion of the work done For the entire Building /Wing 70
56 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 58
56 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
56 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 75
56 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
56 Overall Percentage of Completion of the work done For the entire Building /Wing 53.3
57 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
57 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
57 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 75
57 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
57 Overall Percentage of Completion of the work done For the entire Building /Wing 52.5
58 X number of Slabs of Super Structure 100
58 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
58 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
58 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 75
58 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
58 Overall Percentage of Completion of the work done For the entire Building /Wing 52.5
59 X number of Slabs of Super Structure 100
59 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 42
59 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
59 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 75
59 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
59 Overall Percentage of Completion of the work done For the entire Building /Wing 51.7
60 X number of Slabs of Super Structure 100
60 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 42
60 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
60 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 75
60 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
60 Overall Percentage of Completion of the work done For the entire Building /Wing 51.7
61 X number of Slabs of Super Structure 100
61 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
61 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
61 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 75
61 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
61 Overall Percentage of Completion of the work done For the entire Building /Wing 52.5
62 X number of Slabs of Super Structure 100
62 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 42
62 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
62 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 75
62 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
62 Overall Percentage of Completion of the work done For the entire Building /Wing 51.7
63 X number of Slabs of Super Structure 100
63 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
63 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
63 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 75
63 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
63 Overall Percentage of Completion of the work done For the entire Building /Wing 52.5

 

New documents listed below were uploaded to the Documents section:

  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 6 Disclosure of sold/ booked inventory
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [5]
  • Building Plan Approval (IOD) [69]
  • Certificates of CA (Form 5)
  • Commencement Certificates / NA Order for plotted development [70]
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration in FORM B [2]
  • Details of encumbrances [2]
  • Disclosure of sold/ booked inventory [5]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) [3]
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [6]
  • Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development [4]
  • Proforma of Allotment letter