P51800047081
RERA ID: P51800047081
Project Name: Arkade Prime
Project Type: Others
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-12-31
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Andheri East, Andheri - Kurla Road, Makwana Road, Andheri, Mumbai Suburban-400059

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
778-A

Boundaries:
Etiness
Makwana RoadN Jai Antarikha Commercial Building
WE
S
Vedanta Commercial Building

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 2091 sq.mt.
Sanctioned Built-up Area: 6605 sq.mt.
Recreational Open Space: 449 sq.mt.
No. of Buildings sanctioned: 2
No. of Floors sanctioned: 26
No. of Plinths: 2
No. of Podiums: 4
No. of Stilts: 2

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 271 to 425 sq ft 42 42
2BHK 589 to 659 sq ft 68 63
Office 592 to 1054 sq ft 3 0
Shop 527 to 998 sq ft 4 2
Project Developer:
M/s. Arkade Developers Pvt Ltd.
Organization Type: Company

Address: 2Nd Floor, Arkade House, A. S. Marg, Ashok Nagar, Kandivali East, Next To Children’S Academy, Borivali, Mumbai Suburban-400101

Office Phone: +91 22288 63787
Website URL: www.arkade.in


Member details:
Member Name Designation
Amit Mangilal Jain Director
Sandeep Ummedmal Jain Director
Arpit Vikram Jain Director
Amit Mangilal Jain Authorized Signatory
Arpit Vikram Jain Authorized Signatory


Other Professionals involved:
Professional Name Professional Type
Pankaj Dharkar & Associates Contractor
Abhaas Landscape Contractor
Builtwell Construction Contractor
Kalakruti Architects & Planners Architect
Hiren M. Tanna Engineer
Jignesh Mohan Patel Engineer
Amit T. Jain & Co Chartered Accountant
Santosh B Morge & Co Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Arkade Prime: A New Landmark in Andheri East

Introducing Arkade Prime, a new real estate project by M/s. Arkade Developers Pvt Ltd., poised to redefine urban living in the vibrant hub of Andheri East, Mumbai. Situated strategically on a prime plot spanning 2091 sq. mts. (Plot Bearing No. 778-A) at the intersection of Andheri-Kurla Road and Makwana Road, Arkade Prime promises a harmonious blend of modern architecture and sophisticated amenities.

The project, registered under MahaRERA with ID P51800047081, boasts a strategic location, bordered by prominent landmarks like Jai Antarikha Commercial Building, Etiness, and Vedanta Commercial Building. With a sanctioned FSI of 6605, Arkade Prime is set to rise to 26 floors, offering a mix of residential and commercial units, catering to diverse needs.

The project offers a spectrum of units including 1BHK (271 to 425 sq ft), 2BHK (589 to 659 sq ft), offices (592 to 1054 sq ft), and shops (527 to 998 sq ft), each meticulously designed for contemporary living and seamless functionality. The project promises a luxurious lifestyle, supported by an expansive 449 sq. mts. of recreational open space and an array of modern amenities.

Arkade Developers Pvt Ltd., a renowned name in the real estate sector, is known for its commitment to quality and customer satisfaction. With an impressive track record and a strong team of professionals, the developers are confident in delivering a project that meets the highest standards of design and construction.

Arkade Prime presents an exceptional opportunity to invest in a thriving location with a promising future. With its strategic location, meticulously planned layout, and focus on luxurious amenities, Arkade Prime is set to be a landmark project in Andheri East, offering residents a unique and fulfilling living experience.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 61.06 2 2
Shop 49.02 1 1

 

New documents listed below were uploaded to the Documents section:

  • 5 Disclosure of sold/ booked inventory
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 2 Declaration about Commencement Certificate

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 42
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 28
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 48
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 17
1 Overall Percentage of Completion of the work done For the entire Building /Wing 53.8
2 X number of Slabs of Super Structure 100
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 24
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 21
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 25
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 17
2 Overall Percentage of Completion of the work done For the entire Building /Wing 48.7

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Water Conservation, Rain water Harvesting : 25
Electrical Meter Room, Sub-Station, Receiving Station : 60
Solid Waste Management And Disposal : 85
Fitness Center and Society Office : 50
Swimming Pool : 10
Aggregate area of recreational Open Space : 50
Sewerage (Chamber, Lines, Septic Tank , STP) : 50 Except Septic Tank & STP
Storm Water Drains : 50

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 54.76 11 9
2BHK 58.39 11 9
2BHK 58.54 11 9

 

There are additions/modifications under Professionals section

Professional Name Professional Type
Santosh B Morge & Co Chartered Accountant

 

New documents listed below were uploaded to the Documents section:

  • 4 Disclosure of sold/ booked inventory

 

New documents listed below were uploaded to the Documents section:

  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 25.19 1 1
1BHK 39.43 19 19
2BHK 54.76 11 10
2BHK 56.23 12 10
2BHK 58.39 11 10
2BHK 58.54 11 10
2BHK 61.23 21 21
Office space 55.09 1 0
Office space 66.02 1 0
Office space 98 1 0
Shop 49.02 1 0
Shop 53.51 1 1
Shop 72.61 1 0
Shop 92.77 1 0

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Solid Waste Management And Disposal : 75
Water Supply : 70
Car Parking System : 60

 

New documents listed below were uploaded to the Documents section:

  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 27
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 3
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 17
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 24
1 Overall Percentage of Completion of the work done For the entire Building /Wing 47.1
2 X number of Slabs of Super Structure 92
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 23
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 17
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 23
2 Overall Percentage of Completion of the work done For the entire Building /Wing 45.5

 

New documents listed below were uploaded to the Documents section:

  • 3 Commencement Certificates / NA Order for plotted development

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Solid Waste Management And Disposal : 65
Storm Water Drains : 25
Sewerage (Chamber, Lines, Septic Tank , STP) : 25 Except Septic Tank & STP

 

New documents listed below were uploaded to the Documents section:

  • 3 Disclosure of sold/ booked inventory
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Slabs of Super Structure 58
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 1
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 13
1 Overall Percentage of Completion of the work done For the entire Building /Wing 37.2
2 X number of Slabs of Super Structure 50
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 13
2 Overall Percentage of Completion of the work done For the entire Building /Wing 36.3

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [6]
  • Building Plan Approval / NA Order for plotted development [4]
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development [2]
  • Copy of Layout Approval (in case of layout) [5]
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Deviation Report with respect to Allotment letter
  • Deviation Report with respect to model copy of Agreement
  • Disclosure of sold/ booked inventory [2]
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [4]
  • Proforma of Agreement for sale
  • Proforma of Allotment letter [3]
  • a Details of encumbrances concerned to Finance
  • b Details of encumbrances concerned to Legal