MH
Mumbai Suburban
P51800034725
RERA ID: P51800034725
Project Name: TEJKIRAN
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-03-31
Extended Date of Completion
The project missed completion date 1 time(s) earlier (2024-04-01).
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Vile Parle East, Tejpal Road, Andheri, Mumbai Suburban-400057

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
PLOT NO 7

Boundaries:
Shreeji Kiran CHSL
Railway TrackN Road
WE
S
Vibha Vasu CHSL

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 787 sq.mt.
Sanctioned Built-up Area: 1761 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 10
No. of Plinths: 1

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 520 sq ft 1 1
2BHK 712 to 852 sq ft 4 4
3BHK 875 to 1065 sq ft 4 4
4BHK 1384 sq ft 1 0
Others 572 sq ft 1 1
Shop 130 sq ft 1 0
Project Developer:
TEJ KIRAN CO OP HSG SOC LTD
Organization Type: Societies

Address: 00, Tejkiran, Tejpal Road, Vile Parle East, Opp Haveli, Andheri, Mumbai Suburban-400057

Office Phone: +91 22243 14937


Member details:
Member Name Designation
YOGESH SHAH Chairperson
HIREN MEHTA Secretory
HIREN MEHTA Authorized Signatory


Other Professionals involved:
Professional Name Professional Type
AJIT REDKAR Architect
DR H M RAJE Engineer
RNB AND ASSOCIATES Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Introducing Tejkiran: A New Residential Project in Vile Parle East

Tejkiran, a new residential project located in the coveted Vile Parle East area of Mumbai, promises a comfortable and modern living experience. Developed by TEJ KIRAN CO OP HSG SOC LTD, a registered society, Tejkiran is poised to become a landmark in the neighborhood.

Project Overview:

Tejkiran, registered with MahaRERA under ID P51800034725, is a 10-floor building occupying a plot of 787 square meters. This project is situated on Tejpal Road, strategically located near the iconic Haveli landmark, and enjoys close proximity to key amenities. With its prime location, Tejkiran offers easy access to the city’s bustling commercial centers, public transportation hubs, and social infrastructure.

Development Details:

The project adheres to the sanctioned plan, encompassing a total sanctioned built-up area of 1761 square meters. With no litigation concerns, the project is expected to be completed by April 1st, 2024. The society ensures transparency and adherence to all regulations, including those set forth by MahaRERA.

Lifestyle & Amenities:

Tejkiran is designed to cater to the modern lifestyle needs of its residents. While specific amenities are not detailed, the project’s location and proximity to Vile Parle East’s well-established social infrastructure ensure residents have access to a wide array of amenities. These could include access to vibrant markets, shopping malls, educational institutions, healthcare facilities, and recreational spaces.

A Promising Investment:

Tejkiran presents a promising investment opportunity in a prime location within Mumbai. With its convenient location, modern design, and a reputable developer, this project holds the potential to provide a rewarding investment for homebuyers and investors alike.

Call to Action:

For detailed information about the project, including pricing and floor plans, interested individuals are encouraged to contact TEJ KIRAN CO OP HSG SOC LTD at 2224314937.

Tejkiran promises a comfortable and convenient lifestyle in a desirable location. This project is an exciting addition to the real estate landscape of Vile Parle East, offering a prime opportunity to experience modern living in the heart of Mumbai.

There is a change in Project timelines and the completion date is moved ahead. The project is now scheduled to complete by 2025-03-31

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Podiums 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 100

 

New documents listed below were uploaded to the Documents section:

  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development

 

New documents listed below were uploaded to the Documents section:

  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 3 Disclosure of sold/ booked inventory

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
Shop 12.08 1 0

 

New documents listed below were uploaded to the Documents section:

  • 2 Disclosure of sold/ booked inventory

 

New documents listed below were uploaded to the Documents section:

  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 2 Declaration in FORM B

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 95
1 Overall Percentage of Completion of the work done For the entire Building /Wing 69.5

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Water Supply : 95 WIP
Fire Protection And Fire Safety Requirements : 100 WIP

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Stilt Floor 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
1 Overall Percentage of Completion of the work done For the entire Building /Wing 68

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Treatment And Disposal Of Sewage And Sullage Water : 0 WIP
Landscaping & Tree Planting : 0 WIP
Storm Water Drains : 100 Completed before OC
Sewerage (Chamber, Lines, Septic Tank , STP) : 100 Completed before OC
Water Supply : 75 WIP
Electrical Meter Room, Sub-Station, Receiving Station : 100 Completed before OC
Fire Protection And Fire Safety Requirements : 90 WIP
Water Conservation, Rain water Harvesting : 100 Completed before OC
Solid Waste Management And Disposal : 100 Completed before OC

 

New documents listed below were uploaded to the Documents section:

  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • Architect’s Certificate of Percentage of Completion of Work (Form 1) [6]
  • Building Plan Approval / NA Order for plotted development
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout) [3]
  • Copy of the legal title report
  • Declaration about Commencement Certificate [2]
  • Declaration in FORM B
  • Details of encumbrances
  • Disclosure of sold/ booked inventory
  • Engineer’s Certificate on Cost Incurred on Project (Form 2) [6]
  • Proforma of Allotment letter [3]