RERA ID: P51800008658
Project Name: Shubham Trident - Sundew, Sunrise and Sunglow
Project Type: Residential
Project Status: On-Going Project *
* Projects that were already under development in May 2017, when RERA was implemented.
2024-12-29
Extended Date of Completion
The project missed completion date 2 time(s) earlier (2023-12-30, 2021-02-01).


While Developers may verbally quote early handover dates, please note that RERA authorities would only consider the official completion dates when hearing any complaints.
Project Address:
Chembur, Ghatla Road, Kurla, Mumbai Suburban-400071

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
1526 15261 to 2 1527 15271 to 4 1564 15641 to 4

Boundaries:
13-40 MTR DP ROAD and CTS NO 1566 -
9-15 MTR WIDE DP ROAD - CTS NO 1563N CTS NO 1516-1529 -9-15 MTR WIDE DP ROAD
WE
S
CTS NO 1528 - EXISTING ROAD

The location of a project plays a very important role in its market value. The developers should invariably maintain correct location in RERA records. Potential customers should always verify the correctness of the location record.

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 1651 sq.mt.
Sanctioned Built-up Area: 4644 sq.mt.
Recreational Open Space: 170 sq.mt.
No. of Buildings sanctioned: 3
No. of Floors sanctioned: 42
No. of Plinths: 3
No. of Stilts: 3
No. of Open Parking: 12
No. of Closed Parking: 65

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 541 to 641 sq ft 30 22
3BHK 943 sq ft 2 1
4BHK 1249 to 1291 sq ft 7 4
Project Developer:
Shubham Homes and Contractors Pvt. Ltd.
Organization Type: Company

Address: 303, Golden Bungalow, Juhu Road, Santacruz (W), Near Santacruz West Police Station, Andheri, Mumbai Suburban-400054

Office Phone: +91 22266 14503
Website URL: www.shubhamgroup.net


Member details:
Member Name Designation
Nimesh Subodh Dalal Partner
Dinesh Vinodchandra Shah Partner
Dinesh Vinodchandra Shah Authorized Signatory


Other Professionals involved:
Professional Name Professional Type
SK ENTERPRISE Contractor
KARANI & SANGHOI DESIGNERS Architect
Gireesh M.Rajadhyaksha Consulting Structural Engineers Engineer
Furkhan I. Pettiwala Contractor
Chintan K. Shah Contractor
Ravi Sharoff Contractor


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Shubham Trident: A Luxurious Residential Development in Chembur

Shubham Homes and Contractors Pvt. Ltd. presents “Shubham Trident”, a meticulously designed residential project located in the prime locality of Chembur, Mumbai. This ongoing project, registered under RERA ID P51800008658, promises a sophisticated lifestyle within a vibrant and well-connected neighborhood.

A Prime Location with Unparalleled Convenience:

Shubham Trident occupies a sprawling 1651 sq. m. plot strategically located in Ghatla Road, Chembur, Mumbai. The project enjoys excellent connectivity to major thoroughfares and public transportation, making commuting a breeze. The close proximity to prominent commercial hubs, educational institutions, and healthcare facilities further enhances the project’s appeal.

A Symphony of Modern Living:

This majestic development comprises three elegantly designed buildings, rising to a height of 42 floors each, with three stilt floors offering ample parking space. The project features a total of 12 open parking spaces and 65 closed parking spaces to cater to the parking needs of residents.

A Sanctuary of Amenities and Recreation:

Shubham Trident prioritizes the well-being and leisure of its residents. A dedicated open space of 170 sq. m. is allocated for recreational activities, offering a respite from the bustling city life.

A Commitment to Excellence:

Shubham Homes and Contractors Pvt. Ltd., known for its commitment to quality and timely delivery, is dedicated to delivering a project that exceeds expectations. The project boasts a sanctioned FSI of 4644, allowing for spacious and well-ventilated apartments designed with modern amenities.

A Project Rooted in Transparency and Trust:

Shubham Trident upholds the highest standards of transparency and ethical practices. The project is fully compliant with RERA regulations, ensuring that all information regarding construction timelines, amenities, and project details is readily accessible. The project also enjoys the financial backing of HDFC Bank Limited, reinforcing its financial stability and reliability.

Shubham Trident promises a truly exceptional living experience, combining luxury, convenience, and a commitment to excellence. This project offers an opportunity to invest in a quality development and embrace a sophisticated lifestyle in the heart of Mumbai.

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 50.35 1 1
2BHK 55.75 4 1
2BHK 59.43 10 6
2BHK 59.64 1 0
3BHK 87.66 2 1
4BHK 116.06 4 3
4BHK 120.03 3 1

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
3 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 50
3 Overall Percentage of Completion of the work done For the entire Building /Wing 82.5

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 76 51 75

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Landscaping & Tree Planting : 100 ONLY TREE PLANTING
Fire Protection And Fire Safety Requirements : 100 CFO Received
Aggregate area of recreational Open Space : 95 Almost done

 

New documents listed below were uploaded to the Documents section:

  • 11 Commencement Certificates / NA Order for plotted development

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 51.1 14 14
2BHK 55.75 3 1
3BHK 87.66 2 0

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Aggregate area of recreational Open Space : 75 Almost done
Landscaping & Tree Planting : 50 ONLY TREE PLANTING
Water Conservation, Rain water Harvesting : 100 RAIN WATER HARVESTING

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 76 51 50

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 87.5
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
2 Overall Percentage of Completion of the work done For the entire Building /Wing 87.5

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 59.43 10 5
4BHK 120.03 5 1

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 75
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 95
1 Overall Percentage of Completion of the work done For the entire Building /Wing 87
2 X number of Slabs of Super Structure 100
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
2 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 75
2 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 95
2 Overall Percentage of Completion of the work done For the entire Building /Wing 87
3 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 75
3 Overall Percentage of Completion of the work done For the entire Building /Wing 77.5

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 58.1 5 0

 

New documents listed below were uploaded to the Documents section:

  • 2 Certificates of CA (Form 5)
  • 10 Commencement Certificates / NA Order for plotted development

 

New documents listed below were uploaded to the Documents section:

  • 12 Copy of Layout Approval (in case of layout)

 

Progress updated under Ameneties section

Name Proposed Booked WorkDone(In %)
Covered Parking ( In Numbers) 76 51 35

 

Building/Plot Details section updated for field(s) as below:

Field updated New value
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) 12
Number of Closed Parking 65

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 51.1 14 12
2BHK 55.75 2 0
2BHK 59.43 14 4
4BHK 116.06 5 2

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
1 Overall Percentage of Completion of the work done For the entire Building /Wing 82
2 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
2 Overall Percentage of Completion of the work done For the entire Building /Wing 81
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
3 Overall Percentage of Completion of the work done For the entire Building /Wing 73

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Aggregate area of recreational Open Space : 50 YET TO START
Fire Protection And Fire Safety Requirements : 95 Almost done

 

New documents listed below were uploaded to the Documents section:

  • 2 Proforma of Agreement for sale

 

New documents listed below were uploaded to the Documents section:

  • 1 Proforma of Agreement for sale

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Storm Water Drains : 100 INTERNAL STORM WATER DRAIN IN PLOT
SOCIETY OFFICE : 100 YET TO START
Fire Protection And Fire Safety Requirements : 75 YET TO START
Electrical Meter Room, Sub-Station, Receiving Station : 100 ELECTRIC METER ROOMONLY
GYMNASIUM : 100 YET TO START
Water Conservation, Rain water Harvesting : 50 RAIN WATER HARVESTING

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
1 Overall Percentage of Completion of the work done For the entire Building /Wing 81.5
2 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
2 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
2 Overall Percentage of Completion of the work done For the entire Building /Wing 80.5
3 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
3 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
3 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 90
3 Overall Percentage of Completion of the work done For the entire Building /Wing 72

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
2BHK 55.75 8 3
2BHK 59.43 19 4

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) [2]
  • Building Plan Approval (IOD) [3]
  • CERSAI details [3]
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project) [2]
  • Certificates of CA (Form 5)
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project) [5]
  • Commencement Certificates / NA Order for plotted development [9]
  • Copy of Layout Approval (in case of layout) [11]
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances [2]
  • Disclosure of sold/ booked inventory
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
  • Other
  • Proforma of Allotment letter [4]