RERA ID: P50300045449
Project Name: SAI-SHALWAK
Project Type: Residential
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2025-04-30
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Rathi Nagar, Camp Road, , Amravati-444603

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
64 CTS 577 SHEET 31

Boundaries:
LAYOUT ROAD
LAYOUT ROADN PLOT NO 63
WE
S
20 FT SERVICE LANE

Project location map below based on coordinates provided by the developers to MahaRERA.
If this points to the wrong location, please notify the developers.



Key Details
Total Project Area: 686 sq.mt.
Sanctioned Built-up Area: 1742 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 6
No. of Plinths: 1
No. of Stilts: 1
No. of Closed Parking: 1

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
1BHK 258 sq ft 1 0
1RK 580 to 756 sq ft 4 0
2BHK 580 sq ft 10 8
3BHK 756 sq ft 10 8
Project Developer:
NITIN VINAYAK DANGORE c/o VINAYAK DANGORE
Organization Type: Individual

Address: G-15 ,, Parvati Apartment, West High Court Road, Laxminagar, Near 8 Road Sq, Nagpur (M Corp.), Nagpur (Urban), Nagpur-440010

Office Phone: +91 71222 44422
Website URL: www.shalwak.in


Co-Promotors:
Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement
Arun Deoraoji Khodaskar Individual Area Share


Other Professionals involved:
Professional Name Professional Type
PANKAJ CHINCHMALATPURE & ASSOCIATES Architect
P S PATANKAR & ASSOCIATES Engineer
AMIT A AGRAWAL & ASSOCIATES Chartered Accountant


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

A New Residential Haven in the Heart of Amravati: Introducing SAI-SHALWAK

SAI-SHALWAK, a new residential project in the sought-after locality of Rathi Nagar, Amravati, promises a modern and comfortable lifestyle for its residents. Registered under the MahaRERA ID P50300045449, this project is currently in its initial stages, with a projected completion date of April 30, 2025.

SAI-SHALWAK is situated on a prime plot spanning 686 square meters, bordered by Plot No. 63 to the east, a layout road to the west, another layout road to the north, and a 20-foot service lane to the south. The project encompasses a single building with a sanctioned FSI of 1742, allowing for a total built-up area of 1742 square meters, spread across six floors, including a stilt floor. The project features one plinth level and offers closed parking facilities for its residents.

With a focus on creating a welcoming and comfortable living experience, SAI-SHALWAK is being developed by a renowned developer who has a strong track record in the real estate sector. The project is backed by HDFC Bank, ensuring financial stability and transparency. The project details are readily available on the MahaRERA website, allowing potential buyers to access crucial information and understand the project’s progress.

SAI-SHALWAK stands out as an attractive investment opportunity for discerning individuals and families seeking a modern and convenient living environment in the heart of Amravati. The project’s strategic location, coupled with its well-planned design and amenities, ensures a comfortable and fulfilling lifestyle for its residents. With its timely completion and strong financial backing, SAI-SHALWAK promises to be a valuable addition to the Amravati real estate landscape.

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 X number of Slabs of Super Structure 90
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 70
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 55
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 55
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 35
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 35
1 Overall Percentage of Completion of the work done For the entire Building /Wing 64

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 23.98 1 0
1RK 53.96 2 0
1RK 70.29 2 0
2BHK 53.96 10 8
3BHK 70.29 10 8

 

New documents listed below were uploaded to the Documents section:

  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • 8 Disclosure of sold/ booked inventory
  • 7 Disclosure of sold/ booked inventory
  • 6 Disclosure of sold/ booked inventory
  • 5 Disclosure of sold/ booked inventory
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

New documents listed below were uploaded to the Documents section:

  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Excavation 100
1 X number of Basement(s) and Plinth 100
1 Stilt Floor 100
1 X number of Slabs of Super Structure 80
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 10
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
1 Overall Percentage of Completion of the work done For the entire Building /Wing 51

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Sewerage (Chamber, Lines, Septic Tank , STP) : 10 As Per Sanction
Electrical Meter Room, Sub-Station, Receiving Station : 10 As Per Sanction

 

Units booking and availability updated under Buildings section

Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1BHK 23.98 1 0
1RK 53.96 2 0
1RK 70.29 2 0
2BHK 53.96 10 6
3BHK 70.29 10 7

 

New documents listed below were uploaded to the Documents section:

  • 4 Disclosure of sold/ booked inventory
  • 3 Disclosure of sold/ booked inventory
  • 2 Disclosure of sold/ booked inventory
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)

 

New documents listed below were uploaded to the Documents section:

  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Building Plan Approval / NA Order for plotted development [2]
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development [2]
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Disclosure of sold/ booked inventory
  • Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development