MH
Amravati
P50300033800
RERA ID: P50300033800
Project Name: Vasudeo Apartment
Project Type: Others
Project Status: New Project *
* Projects that started May 2017 onwards, after RERA was implemented.
2027-03-31
Proposed Date of Completion
 
The Occupancy Certificate (OC) is seen uploaded to the Documents section on the MahaRERA portal. Please check and confirm its validity and whether it is for full or partial occupancy.
Project Address:
Vasudeo Nagri, Plot No. 61 And 62 Survey No 23 Mouje Akoli , Akoli Road, Amravati (M Corp.), Amravati-444607

Plot Bearing No / CTS no / Survey Number/Final Plot no.:
61 And 62 Survey No. 23 Mouje Akoli

Boundaries:
Road
Plot 60N Road
WE
S
Road

Location coordinates were not provided to MahaRERA by the developers. Below is an approximate location, and may contain error.



Key Details
Total Project Area: 511 sq.mt.
Sanctioned Built-up Area: 1751 sq.mt.
Recreational Open Space: 0 sq.mt.
No. of Buildings sanctioned: 1
No. of Floors sanctioned: 7
No. of basements: 1
No. of Plinths: 1
No. of Open Parking: 9

Units on Offer and Availability
Category Carpet Area No of Units Units already Booked / Sold
2BHK 561 to 680 sq ft 16 0
Shop 85 to 205 sq ft 16 0
Project Developer:
Saurabh Raju Ingole c/o Raju Shankarrao Ingole
Organization Type: Individual

Address: 01B, Rushikesh, Akoli Road, Nalanda Colony, Dr. Patil Clinic, Amravati (M Corp.), Amravati-444607

Office Phone: +91 72125 79587


Other Professionals involved:
Professional Name Professional Type
Rushikesh Ingole Architect
Er Saurabh Ingole Engineer
CA TAPESH MUNDADA Chartered Accountant
RISHABH KHANDELWAL Other Professional


Litigations

Litigations related to the project ? No
When this data gets the AI treatment, it churns out conclusions like the one below. But hey, a Real Intelligence like yourself, would go a step further by visiting the project site, meeting the people involved, carefully analyzing all the options, and then making an informed decision. Right? Happy hunting!

Vasudeo Apartment: A New Residential and Commercial Hub in Amravati

Vasudeo Apartment, a new project registered with MahaRERA under ID P50300033800, is set to become a prominent landmark in the bustling city of Amravati. Located in the prime locality of Vasudeo Nagri, the project offers a unique blend of residential and commercial spaces, catering to the diverse needs of modern-day living.

The project encompasses a total plot area of 511 square meters, situated at Plot No. 61 and 62, Survey No 23, Mouje Akoli, Akoli Road, Amravati. The strategically chosen location provides residents and businesses with easy access to essential amenities, transportation, and commercial hubs.

Vasudeo Apartment will consist of a single, elegantly designed building, rising to seven floors, including a basement and plinth. This well-planned structure promises a comfortable and convenient lifestyle for its residents. The project offers a total of 16 spacious 2BHK apartments, ranging from 561 to 680 square feet, providing ample living space for families. Furthermore, 16 commercial shops are available, ranging from 85 to 205 square feet, offering lucrative opportunities for entrepreneurs and businesses.

The project prioritizes convenience and security, offering 9 open parking spaces for both four-wheelers and two-wheelers, ensuring ample parking space for residents and visitors.

Vasudeo Apartment is a promising project backed by a reputable developer with a strong financial foundation. The project is financed by State Bank of India, with an IFSC code of SBIN0000311, adding further credibility and assuring potential buyers of the project’s financial stability.

The proposed completion date is March 31st, 2027, with no pending litigations associated with the project. Vasudeo Apartment offers a unique opportunity to invest in a well-planned and strategically located property in Amravati. Whether you are seeking a comfortable home or a thriving business space, this project presents a compelling investment proposition.

New documents listed below were uploaded to the Documents section:

  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
  • 1 Occupancy Certificate/ Completion Certificate/ Architect’s certificate of completion for plotted development
  • 1 Architect’s Certificate on Completion of Project (Form 4)

 

Progress updated under Buildings section

Bldg No. Tasks / Activity Percentage of Work
1 Excavation 100
1 X number of Basement(s) and Plinth 100
1 X number of Slabs of Super Structure 100
1 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
1 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
1 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
1 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
1 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
1 Overall Percentage of Completion of the work done For the entire Building /Wing 80

 

Progress updated under Ameneties section

Common areas And Facilities, Amenities Percent Details
Open Parking : 100 AS PER MAP
Water Conservation, Rain water Harvesting : 100 AS PER MAP
Water Supply : 100 AS PER MAP
Sewerage (Chamber, Lines, Septic Tank , STP) : 100 AS PER MAP

 

Documents listed below were found uploaded on the first day this project was indexed. More documents, whenever uploaded, will be shared as posts on dates of upload.

  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
  • Building Plan Approval / NA Order for plotted development
  • CERSAI details
  • Commencement Certificates / NA Order for plotted development
  • Copy of Layout Approval (in case of layout)
  • Copy of the legal title report
  • Declaration about Commencement Certificate
  • Declaration in FORM B
  • Details of encumbrances
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
  • Proforma of Allotment letter [2]